New Parkland Hospital gets bold exterior

Despite its many amenities, advanced technologies and sheer scope, New Parkland’s most recognizable feature is the bold design that fashions the building’s exterior


Beginning as a simple clapboard building in 1894, Parkland Hospital steadily grew into the premier, full-scale medical facility of Dallas. Famous for being the hospital John F. Kennedy was brought to after being fatally shot on November 22, 1963, Parkland Hospital is better known locally for its many years of dedicated medical service. Despite its iconic role in history, age finally caught up with the hospital as it slowly became too outdated and undersized to adequately care for its many patients. To rectify the hospital’s problem, construction began in 2010 on a $1.27 billion replacement - the New Parkland Hospital - an undertaking more than twice the size of its predecessor.

Spanning over 2 million square-feet and 18-stories, the completion of New Parkland Hospital required the combined efforts of BARA, a joint venture between Balfour Beatty Construction, Austin Commercial, H.J. Russell & Company and Azteca Enterprises, and architects from both HDR and Corgan. Together, the companies developed designs for a state-of-the-art facility featuring 862 full-service rooms, cutting-edge medical technology, a stand-alone clinic, parking structures and several support facilities. The team also aimed to “put the park back in Parkland” by designing a campus-like maze of landscaped paths, gardens, and green space to surround the complex.

From a distance, the hospital itself appears as if two skyscrapers fell from the sky and landed horizontally on top of one another. Despite its many amenities, advanced technologies, and sheer scope, New Parkland’s most recognizable feature is the bold design that fashions the building’s exterior. BARA teamed up with specialists from Morin and ALPOLIC to formulate exterior metal applications clad in Valspar coatings to obtain the hospital’s unique façade.

Morin provided New Parkland Hospital with a beautiful exterior wall system consisting of MX 1.0 Matrix Series® Panels and Flat Concealed Fasteners covered in a Grey Metallic color of Valspar’s Fluropon coating. Valspar’s Fluropon is the industry standard for architectural coatings, and offers resistance to weathering, fading and chalking. Fluropon coatings contain 70 percent PVDF resins resulting in outstanding protection against dirt and staining as well exceptional color consistency and retention. 

ALPOLIC supplied 198,783 square-feet of aluminum composite material (ACM) to construct the exterior rain screen. The 4mm ALPOLIC®/fr-RF aluminum panels were adorned with Valspar’s Valflon, a highly durable fluropolymer (FEVE) resin based coating, in the color PEX Metallic Pewter. Valspar’s Valflon offers New Parkland Hospital a unique blend of durability features as well as an ability to produce high-gloss, vivid colors that provide an eye-catching that will keep the facility operating in fashion for many years. 

On August 20, 2015, New Parkland Hospital welcomed its very first patients through its doors and into the leading-edge facility. Over the course of several days, 600 patients were transferred from the old hospital into the new complex, a process Parkland staff had been coordinating for more than a year. Now fully operational, New Parkland has the capacity, technology, and structural design to fully care for its patients and look good doing it for many years to come.

Project overview

Project: New Parkland Hospital; Dallas, TX

Owner: Parkland Health and Hospital System

Date completed: October 31, 2014 construction ended; August 20, 2015 first patients treated

Coatings provider: The Valspar Corporation; Minneapolis, MN

Construction manager: BARA - Joint venture team consists of Balfour Beatty Construction, Austin Commercial, H.J. Russell & Company and Azteca Enterprises 

Architect: HDR Inc.; Dallas, TX, Corgan; Dallas, TX

Metal panels manufacturers: ALPOLIC, Chesapeake, VA

Morin Corp.; Deland, FL

Panels installer: ROC Construction; Imperial, CA

 

 

 

 

 



February 26, 2016


Topic Area: Project Management


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.