Jeff Tataro

10 considerations when converting to private hospital rooms

Key issues include safety, accessibility and environmental- and technology-friendliness

By Healthcare Facilities Today


There are many considerations that need to be addressed when healthcare facilities are converting semi-private rooms to private, according to an article on the Medical Construction & Design magazine website.  

Recognizing “necessity is the mother of invention,”  a team from Array Architects developed a Top 10 list of considerations to help healthcare organizations develop effective plans when considering renovating/converting existing spaces.

1. Finding the balance between Lean and mean. Implement Lean principles during design to help identify potential staff inefficiencies posed by the renovation. 

2. Logistical considerations. Determine the appropriate level of renovation required, and in developing a plan to effectively execute the renovation in a manner that minimizes any disruption of the day-to-day hospital operations.  The specific circumstance of any given renovation situation will drive many of the detailed decisions.

3.  Life safety considerations. Turning an operating nursing unit into a temporary construction site creates numerous environmental challenges that can only be addressed with proper planning and the execution of a well-conceived plan that incorporates proven interim life safety measures.

4. More than just hand-washing. Identify and mitigate risks from infection that could occur during construction activities.

5. Safe environment + happy patients = higher HCAPHS scores. Typically, hospital falls occur most often when patients attempt to get to the bathroom. If a headwall is not located on the wall closest to the bathroom, consider relocating the headwall or the bathroom so the patient never has to cross an open floor. 

6.  Engineering considerations.  A comprehensive facility condition assessment can go a long way toward shedding some light on what otherwise could remain a mystery until uncovered during the construction phase of a renovation project – when surprises are expensive.

7. Accommodating technology. Renovations need to incorporate alternate access modes complementary to traditional PC nodes and provide space for the IT infrastructure required to support it. As electronic medical record access becomes the hub of all activity on the floor, providing frequent, comfortable, convenient and reasonably private access points is critically important.

8. Accessibility is more than handicapped toilets. It’s best to anticipate the needs of disabled patients for their entire hospital stay during planning phase. During design, visualize the entire path of travel from the drop-off point to the patient’s destination. 

9. Making your father’s Oldsmobile run like a Prius. Investigate all opportunities to recycle construction waste, identify design and engineering options that reduce electricity and water use and focus on selecting sustainable materials that support high indoor environmental quality. 

10. Creating new spaces to support family involvement. Renovation of an outdated patient tower provides an opportunity to re-invent the patient experience.  Remember to provide spaces that offer a range of interaction for patients, staff and families that range from interactive to private.

Read the article.

 

 

 

 



January 22, 2014


Topic Area: Renovations


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.