ANF Group and Providence One Partners Break Ground on New Assisted Living Facility

The new facility will have 117 units with 121 beds of assisted living and memory care.

By HFT Staff


ANF Group in conjunction with Providence One Partners broke ground on a 114,003-square-foot assisted living facility in Pembroke Pines, Florida. 

The two-story building will have 117 units with 121 beds of assisted living and memory care. Designed by Forum Architecture, the building will include restaurant-style dining rooms with meals prepared on-site, full-service salon, fitness center with a physical therapy room and private massage room, multiple living rooms equipped with iN2L smart televisions, theatre, and craft rooms. 

Individual units will be equipped with upgraded lighting and plumbing fixtures, wood vinyl plank flooring throughout, full ADA-compliant and zero entry showers, 42-inch televisions in every room with cable, Wi-Fi and a wireless emergency call system.  

This project is being developed by Providence One Partners and ANF Real Estate Group. It will be constructed by ANF Construction Group and managed by Providence Senior Living.  The project is expected to open to residents in the fourth quarter of 2023. 

 

 



July 1, 2022


Topic Area: Construction


Recent Posts

Making Multi-Site Lighting Upgrades Work

Success requires a program structure that connects audits, financial analysis, rebate administration, procurement, scheduling and closeout documentation.


Designing a Positive Care Destination for Children

The new Mary Bridge Children’s Hospital reimagines the healthcare experience to create an environment that feels welcoming from arrival to discharge.


Blackbird Health Opens 10th Clinic in Pennsylvania

The Bala Cynwyd clinic represents Blackbird Health's 13th location overall.


Healthcare Construction Infection Control: Essential CDC Guidelines for Active Facilities

Construction and renovations happen, but that doesn’t mean infection prevention can take a backseat. The CDC has some recommendations for maintaining best practices during construction.


Protecting the Most Vulnerable: Inside the NICU

SSM Health St. Mary’s Hospital leaders share how maintaining power, air quality and essential systems helps protect patients during their most vulnerable moments.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.