Advance SC500 Walk-Behind Scrubber with EcoFlex provides improved productivity and sustainability


Advance, the brand known and trusted to introduce productivity-enhancing innovations in the commercial cleaning market, proudly introduces the Advance SC500™ Walk-Behind Scrubber. By combining efficiency, ergonomics and ease of use, the Advance SC500 is specifically designed to provide more productive and sustainable daily cleaning for a wide variety of facilities, including hospitals, schools, retailers, grocers, offices, athletic facilities, and hotels. 

“Advance has a proven track record of providing our customers with cleaning technologies that meet their productivity, efficiency and sustainability needs,” said Jonathan Kingsbury, vice president of Commercial Sales with Nilfisk. “The SC500 is yet another example of that. It is ideal for cleaning professionals who need a quiet, easy-to-use walk-behind scrubber that can improve productivity and, at the same time, enhance sustainability.”

The SC500 features Advance’s innovative flow regulation system that adjusts the solution flow rate based on the machine’s speed. The system ensures consistent cleaning results, reduces water and chemical usage, and results in less downtime. The ultra quiet SC500, which operates at 63 dBA, also boasts a Quiet Mode of 60 dBA. Quiet Mode allows for true daytime cleaning in even the quietest environments. And, the SC500 includes EcoFlex, which allows the operator to effortlessly switch between chemical-free, water-only cleaning and varying degrees of detergent use.

Additional features and benefits of the SC500 include its ergonomic and easy-to-use design, such as a pressure-sensitive control panel; single-button solution, vacuum and brush deck activation; a foot pedal to engage the squeegee; and effortless propulsion, all of which make the SC500 easy for virtually any operator to use and control. 

The 20-inch, 12-gallon SC500 replaces Advance’s Adfinity 20-inch scrubber line. It is available in both disc and orbital REV™ models. 

 



August 6, 2015


Topic Area: Press Release


Recent Posts

Preparing Healthcare Facilities for Wildfire Air Quality Events

Wildfire smoke puts pressure on mechanical systems already working hard to maintain controlled indoor environments.


UW Health Set to Open Expansion at East Madison Hospital

The $140 million project adds 120,000 square feet to the hospital, expanding its footprint to roughly 620,000 square feet.


Central Ohio Primary Care Physicians Falls Victim to Cyberattack

While the full extent of the incident is still under review, our initial investigation discovered that there are approximately 1.4 million individuals impacted.


The Role of Biophilic Design in Healthcare Facilities

Nature-inspired design can support staff well-being and create more welcoming, human-centered healthcare environments.


TriStar Centennial Medical Center Invests $90M in Women, Children's Hospital Expansions

The multi-year project will bring significant improvements to both hospitals.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.