Aircuity to Begin Installation at Virginia Commonwealth University


Aircuity, (www.aircuity.com), creator of measurably better environments, announces that it will begin installation at three laboratory research buildings at the Virginia Commonwealth University (VCU) School of Medicine. Aircuity is acting as the turnkey contractor for the installation of Aircuity’s intelligent building platform along with upgrades to controls and exhaust systems. The project is scheduled to begin in December 2017.

Part of an $18 million performance contract between the university and Schneider Electric, the Aircuity system will decrease the energy usage in Sanger Hall, Kontos Hall, and Robert Blackwell Smith Hall. The energy savings from Aircuity will be used to address deferred maintenance projects in two of the buildings, including controls upgrades in both Kontos and Robert Blackwell Smith Halls and a consolidation of rooftop exhaust fans in Robert Blackwell Smith Hall.  Building upgrades will be performed in conjunction with Aircuity Channel Partner, Metropolitan Equipment Group.

In addition to deep energy savings and helping to address VCU’s deferred maintenance backlog, Aircuity will enhance the Indoor Environmental Quality (IEQ) for occupants of the labs. Through the Aircuity 2.0 web app, multiple constituents at the university will have access to continuously captured data and analytical tools that provide data on savings achieved, protection provided to occupants and additional opportunities for improvement

Since its launch in 2000, Aircuity has been the leader in demand control ventilation and indoor environmental quality solutions. The system is implemented in more than 200 laboratory and higher education facilities around the world, including Michigan State University, University of California, Irvine and Northwestern University. Aircuity 2.0, which was launched in May, further distinguishes Aircuity as the most robust, efficient, and verifiable airside solution available.

For additional information on the company and its solutions, please visit: www.aircuity.com.



December 12, 2017


Topic Area: Press Release


Recent Posts

How Can Healthcare Facilities Use Efficiency to Drive Climate and Health Goals?

Keith Edgerton discusses how the Health Care Energy & Water Efficiency Checklist helps healthcare connect operational savings with their mission to protect people and the planet.


El Camino Health Rehabilitation Hospital Officially Tops Out

This new 64,000-square-foot, 52-bed inpatient facility in Sunnyvale, California, will enhance rehabilitation services in Santa Clara County.


Vibra Hospital of Sacramento Reports Data Breach

Vibra Hospital is not aware of any evidence to suggest that any information has been misused.


EV Charging Station Design: Ensuring Patient Access

The question is not whether to install charging infrastructure — the organization eventually will have to — but how to do it without disrupting patient care.


Sanford Health and Prairie Lakes Healthcare System Merge

Prairie Lakes Healthcare System will transition to the Sanford Health name and brand while preserving and expanding health services across the communities it serves.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.