Armstrong unveils improved Astro 2 hot water recirculation systems


Armstrong Fluid Technology has introduced new versions of the popular Astro 2 Hot Water Recirculation (HWR) pumps.  A hot water recirculation system can save a typical family over 12,000 gallons of water per year by eliminating the waste of water that occurs when occupants open a hot water faucet and have to wait for hot water to reach the fixture. 

Astro 2 HWR circulators are suitable for use in a 3-pipe installation with a dedicated return. The Astro Express 2 System includes the innovative Astro Express LF Valve and is designed for use in a standard residential 2-pipe installation.

Key enhancements offered in the new version of Astro 2 circulators include:

• Larger, easier-to-service electrical enclosure includes an integrated timer assembly 

• Timer Accessory Kit that can be used to upgrade earlier version Astro 2 circulators

• New Timer Accessory Kit that can be used to upgrade new generation Astro 2 circulators

• Easier field assembly of timers reduces installation time

• Industry-leading five year warranty

Astro 2 HWR circulators are available in both stainless steel and bronze versions, with either NPSM Union or ‘sweat’ connections.

“In addition to offering customers more sustainable solutions, the new Astro 2 HWR helps contractors and homeowners with easier installation and an industry-leading warranty.” said Andy Januszewski, Armstrong Marketing Manager. 

 

 

 



February 2, 2016


Topic Area: Press Release


Recent Posts

Energy Security: Benefits of Hospital Microgrids

Healthcare facility managers need to keep medicine, machines, information and life-support systems operating when the surrounding infrastructure is not.


UT MD Anderson to Expand Texas Medical Center Via Two New Facilities

Inspiration Tower and Prism will serve as the new front door to UT MD Anderson.


Hoag Hospital Reports Data Security Incident 

The hospital discovered suspicious activity within its network on Oct. 8, 2026.


What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


HealthSource of Ohio and UC Health Partner for New Medical Office Building

Construction is anticipated to be completed in 2028.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.