Armstrong unveils improved Astro 2 hot water recirculation systems


Armstrong Fluid Technology has introduced new versions of the popular Astro 2 Hot Water Recirculation (HWR) pumps.  A hot water recirculation system can save a typical family over 12,000 gallons of water per year by eliminating the waste of water that occurs when occupants open a hot water faucet and have to wait for hot water to reach the fixture. 

Astro 2 HWR circulators are suitable for use in a 3-pipe installation with a dedicated return. The Astro Express 2 System includes the innovative Astro Express LF Valve and is designed for use in a standard residential 2-pipe installation.

Key enhancements offered in the new version of Astro 2 circulators include:

• Larger, easier-to-service electrical enclosure includes an integrated timer assembly 

• Timer Accessory Kit that can be used to upgrade earlier version Astro 2 circulators

• New Timer Accessory Kit that can be used to upgrade new generation Astro 2 circulators

• Easier field assembly of timers reduces installation time

• Industry-leading five year warranty

Astro 2 HWR circulators are available in both stainless steel and bronze versions, with either NPSM Union or ‘sweat’ connections.

“In addition to offering customers more sustainable solutions, the new Astro 2 HWR helps contractors and homeowners with easier installation and an industry-leading warranty.” said Andy Januszewski, Armstrong Marketing Manager. 

 

 

 



February 2, 2016


Topic Area: Press Release


Recent Posts

Upward Mobility: Market Forces Drive Hospitals Higher

Healthcare facilities nationwide are navigating challenges and opportunities presented by expanding their reach into the sky.


Georgia Hospital Bomb Hoaxes Highlight Need for Healthcare–Police Partnerships

Proactive planning and close collaboration with law enforcement help healthcare facilities maintain safety and continuity during false threats.


MUSC Health Celebrates Groundbreaking for Nexton Hospital and Ambulatory Cancer Facility

The Nexton cancer facility is expected to open in summer 2027, and the Nexton hospital in summer 2028.


Mattresses Require Strict Care to Prevent Spread of Infections

Poor cleaning and disinfection techniques contribute to the persistent contamination of patient mattresses.


Gardner Health Services Opens Alum Rock Health Center

The 10,080-square-foot facility provides essential medical, dental, mental and chiropractic services to the Mayfair and East San José neighborhoods.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.