Assessing potential utility problems and responses can help with CMS compliance

Planning for utility system failure is essential for patient care


Planning appropriate response and recovery activities for a failure of the facility’s utility systems is essential for patient care and Centers for Medicare & Medicaid Services (CMS) compliance, according to an article on the Health Facilities Maintenance website.

Some of the most important utilities include mechanical (e.g., heating, ventilation and cooling); electrical (i.e., normal power and emergency power); domestic hot and cold water as well as other plumbing systems; waste; technology systems, including the myriad communications and data-transfer systems; vertical transportation utilities; fire alarm and suppression systems; fuel systems; access control, duress alarm and surveillance systems; medical gases, air and vacuum systems; and pneumatic tube systems, the article said.

The article specifically discussed the CMS Conditions of Participation Section 482.15 pertaining to hospital emergency preparedness for all hazards. 

Numerous technical resources are available to help review utility failure procedures. One new resource is a website established by the Department of Health & Human Services’ Assistant Secretary for Preparedness and Response. 

Read the article.

 

 



July 20, 2017


Topic Area: Energy and Power


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.