AtlasIED Introduces Line of Portable Indoor/Outdoor Public Address Systems


To alleviate overcrowding at hospitals and to care for an increased number of patients, temporary medical and testing facilities are quickly being erected. These facilities need high-quality public address systems to assist with crowd control, patient messaging, and critical announcements. To serve this critical need now, AtlasIED introduces its new Temporary Audio Systems (TAS) line of portable indoor/outdoor packaged audio systems. 

To facilitate quick and easy setup, the TAS systems come packaged with all the necessary components, including all-weather speakers, handheld and desktop microphones, speaker/mic stands, power conditioners, amplifiers, cabling, and more. Four different packages are available, designed to serve facilities from 4,960 square feet up to 187,000 square feet. Solutions can also be customized to meet the audio requirements of any temporary medical environment. AltasIED’s customer support team is available at support@atlasied.com to help configure systems and to answer any questions. 

“Understanding the gravity of the situation and the urgent need for these facilities to come online, fast, we’ve put together temporary audio packages to help people get them up and running quickly,” says John Ivey, President at AtlasIED. “The systems ship from one of our US-based warehouses and the individual components are portable, so they can be easily transported and relocated as new facilities are erected. With four different packages currently available, there’s a solution to meet the size and scope of any temporary medical or testing facility.” 

Packages include the TAS-1 (up to 20,000 square feet), TAS-2 (up to 4,960 square feet), TAS-3 (up to 47,678 square feet), and TAS-4 (up to 187,500 square feet). All are available now for shipment and can be expedited as needed. 

Equipment comprising the TAS packages is also ideally suited to indoor and outdoor venues of all types. Not just a short-term solution, these packaged and customized offerings are useful for athletic fields, gymnasiums, and other places where gatherings occur.

To learn more, visit www.atlasied.com/portablepa.

 

 



April 30, 2020


Topic Area: Press Release


Recent Posts

From Downtime to Data: Rethinking Restroom Reliability in Healthcare

Manufacturers discuss the operational issues plaguing healthcare restrooms and how to shift maintenance from reactive to resilient.


LeChase Building Four-Story Addition to UHS Delaware Valley Hospital

It will consolidate services into a state-of-the-art Medical Neighborhood.


AdventHealth Sebring Breaks Ground on Expansion Project

Construction is scheduled to begin in March and is anticipated to be completed in Fall 2027.


Regulations Take the Lead in Healthcare Restroom Design

Infection-control guidance and water management standards drive earlier planning, smarter fixtures and more resilient restroom environments.


AHN Allegheny Valley Hospital Opens Expanded Inpatient Rehabilitation Unit

Construction began in July 2025 and included 12 new inpatient rehabilitation beds, bringing the unit’s total to 29.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.