Baldor Electric Company introduces large AC - GPM Induction Motor product line


Fort Smith, Ark. – Baldor Electric Company is proud to announce a new line of energy efficient electric motors. The Large AC – GPM induction motor is available up to 1,500 HP. Large AC – GPM motors are available in stock ratings of 250 – 1,000 HP, 2300/4000 Volt, Totally Enclosed Fan Cooled (TEFC), foot mounted designs. Custom motors are available in 250 – 1,500 HP, 460, 575, 2300/400 Volt, TEFC, in foot mounted designs. The GPM product line of Large AC motors fits various industrial applications including pumps, fan, conveyors and compressors requiring high torque.

Stock GPM motor features include all cast iron construction, drive end slinger, insulated opposite drive end bearing, winding RTDs, space heaters, provisions for bearing RTDs and a ground lug in the conduit box.

The entire product line is suitable for use on variable frequency drives.

# # #

Baldor Electric Company (www.baldor.com) is a leading marketer, designer and manufacturer of industrial electric motors, drives, and mechanical power transmission products.

Baldor, a member of the ABB group, is headquartered in Fort Smith, Arkansas.

Baldor Electric Company • 5711 R.S. Boreham, Jr. St. • Fort Smith, AR 72901 • Phone: 479-646-4711 • www.baldor.com

 



July 7, 2014


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.