Brokk Introduced the Brokk 200, a New Weight Class of Machine, at World of Concrete 2019


 Brokk, the world’s leading manufacturer of remote-controlled demolition machines, introduced the Brokk 200, a new weight class of machine. The new model packs the power of a 3-ton Brokk machine into a 2-ton package. 

The Brokk 200 is one of four new next generation remote-controlled demolition machines Brokk showcased at World of Concrete 2019 in Las Vegas.

The machine comes equipped with Brokk’s signature SmartConcept™ technology for increased efficiency. SmartConcept includes the extra power of SmartPower™, the added reliability of SmartDesign™ and enhanced ergonomics and productivity of SmartRemote™. 

“When we set out to design the Brokk 200 we saw an opportunity to support customers further by introducing a new weight class,” said Martin Krupicka, President and CEO of Brokk Group. “The Brokk 200 allows contractors to work in tight spaces without a loss in power.” 

The 27.5-kilowatt machine operates tools with requirements typical of one weight class above. When paired with the new Brokk BHB 305 breaker, the unit’s hitting power is increased by 40 percent. The new class of machine delivers 450 foot-pounds (610 joules) with each blow of the 650-pound (295-kilogram) hydraulic breaker.

In addition to its heightened power, the Brokk 200 offers 15 percent longer vertical and horizontal reach in a compact footprint similar to the Brokk 170. The extra chassis length and machine weight ensures proper balance, even when wielding heavy attachments, such as breakers, drum cutters, grapples and concrete crushers. The Brokk 200 is ideal for heavy duty, difficult-to-access projects and applications and represents the new standard in compact remote-controlled power.

To find out more about the Brokk 200 or the other models in the next generation visit www.brokk.com.  



February 27, 2019


Topic Area: Press Release


Recent Posts

UCI Health Set to Open First All-Electric Hospital

All-electric acute care hospital aims to help University of California’s goal of reducing 90 percent of total carbon emissions by 2045.


Ground Broken on Baptist Health Sunrise Hospital

The planned seven-story, 340,000-square-foot facility is expected to open to patients in 2029.


Rapid City Medical Center to Join Monument Health

The parties will perform further due diligence with the intention to sign definitive agreements and close on the transaction later this spring.


AI Adoption on the Rise Among Leaders

AI usage increased in all markets in the fourth quarter of 2025.


TriasMD Officially Opens DISC Surgery Center at Tarzana

At 10,930 square feet, DISC Surgery Center at Tarzana includes three high-technology operating rooms and 11 patient care bays.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.