Building Automation Helps Boost University Energy Savings


Aircuity, creator of measurably better environments, announces that it will begin installation at three laboratory research buildings at the Virginia Commonwealth University (VCU) School of Medicine. Aircuity is acting as the turnkey contractor for the installation of Aircuity’s intelligent building platform along with upgrades to controls and exhaust systems. 

Part of an $18 million performance contract between the university and Schneider Electric, the Aircuity system will decrease the energy usage in Sanger Hall, Kontos Hall, and Robert Blackwell Smith Hall. The energy savings from Aircuity will be used to address deferred maintenance projects in two of the buildings, including controls upgrades in both Kontos and Robert Blackwell Smith Halls and a consolidation of rooftop exhaust fans in Robert Blackwell Smith Hall. Building upgrades will be performed in conjunction with Aircuity Channel Partner, Metropolitan Equipment Group. 

In addition to deep energy savings and helping to address VCU’s deferred maintenance backlog, Aircuity will enhance the Indoor Environmental Quality (IEQ) for occupants of the labs. Through the Aircuity 2.0 web app, multiple constituents at the university will have access to continuously captured data and analytical tools that provide data on savings achieved, protection provided to occupants and additional opportunities for improvement 

Since its launch in 2000, Aircuity has been the leader in demand control ventilation and indoor environmental quality solutions. The system is implemented in more than 200 laboratory and higher education facilities around the world, including Michigan State University, University of California, Irvine and Northwestern University. Aircuity 2.0, which was launched in May, further distinguishes Aircuity as the most robust, efficient, and verifiable airside solution available.



February 16, 2018


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.