CPI Daylighting's Pentaglas panels help heal through interactive LED color at the Akron Children's Hospital


LAKE FOREST, IL  – Using LED light boxes to illuminate 14,500-sq.-ft. of CPI Daylighting’s Pentaglas® panels covering a new 5-story parking garage, the Akron Children’s Hospital hopes to heal through color.

When the new adjacent children’s critical care tower opens in May, patients in common areas and those with a window view from their rooms will be given iPads with controls to change the color of the panels as they see fit, creating an interactive mural of light visible to all.

“We were looking for something that could be illuminated and that would help punch the color from the LEDs out,” said architect Michael Marz of Akron, Ohio-based GPD Group. “The ability of the Pentaglas panels to transmit the light uniformly and help diffuse it so we didn’t have a single point source of light was what we were looking for. Blending nicely from top to bottom, we don’t get any hot spots.”

Free spanning from floor to floor, most of the Pentaglas panels are one continuous length, providing aseamless, flush look around the four-sided parking structure. Specified in ice white, the single panel Pentaglassystem was installed in two custom sizes: 50-ft. tall by 12-ft. long and 32-ft. tall by 12-ft. long.

Featuring CPI Daylighting’s Nano-Cell® technology which promotes long-term resistance to impact and wind loading due to it’s small cell structure and tightly spaced rib supports, the Pentaglas panels are made with a unique internal flexibility to absorb thermal expansion across the panel and in all directions. Most significantly, though, the panels offer superior light diffusion capabilities ensuring excellent quality of natural light and are 100% recyclable – making them ideal for any LEED project. Made with heavy-duty co-extruded UV protection, the Pentaglas panels come with a single-source warranty.

Due to the collaborative nature of the design-build project at the Akron Children’s Hosptial, the architects and contractors worked closely with CPI Daylighting to ensure success. “The hospital wanted to know that the installation would look right so CPI sent out panels and we did a full scale mockup on the floor before we installed the panels,” said Marz.

Built to serve multiple hospital facilities, the parking garage has become a local attraction in the year it’s been in operation.

“The panels have helped make the parking deck a real landmark in town,” said Marz. “The first night they were operational, the president of the hospital was getting calls from people in the hospital and others in town saying it was really neat that the colors changed.” 



December 10, 2014


Topic Area: Press Release


Recent Posts

Why New Era of Care Demands an Ambulatory Facilities Approach

The shift from hospital-centric to ambulatory care has outpaced most health systems’ operating models, creating urgency for a new facilities management playbook.


ClearSky Health Plans New Medical Rehabilitation Hospital in North Carolina

The hospital will provide specialized rehabilitative care to patients recovering from disabling injuries or illnesses.


Bacon County Health Services Reports Data Breach

Immediate action was taken to secure its network and to ensure that patient care was not disrupted.


Building Around Care: Lessons in Modernizing Active Healthcare Environments

The challenge is how to modernize a healthcare facility while patients continue receiving care and physicians, nurses and staff continue providing it.


St. Luke's Heart Hospital Opens at Anderson Campus in Pennsylvania

The five-story, approximately 355,000-square-foot facility is seamlessly integrated into St. Luke's Anderson Campus.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.