Case Study: How To Safely Upgrade Fire Protection Systems

Temporary fire pump system keeps long-term care facility online


A healthcare facility’s fire protection infrastructure is arguably the most critical of its life safety systems. Facility managers rely on it to detect and suppress smoke and fire, evacuate occupants quickly, alert emergency personnel and maintain local code compliance — all at the same time. 

Retrofitting or upgrading the fire protection system of an existing facility is not uncommon due to a rise in safety awareness and code regulations governing commercial and industrial fire safety standards, but it can pose several challenges. A temporary fire protection solution that integrates with an existing pumping system helps ensure continuity and compliance. 

Hebrew SeniorLife, a senior care organization affiliated with Harvard Medical School, is an integrated, eight-site health care, housing, research and teaching system that serves thousands of seniors in the Greater Boston area and beyond. In August 2020, the organization’s Hebrew Rehabilitation Center, an acute long-term care hospital facility located in Boston’s Roslindale neighborhood, needed to undergo fire system upgrades as part of an overall revitalization project at the long-term care campus. 

In order to update the hospital’s existing fire protection equipment, a temporary fire pump system was needed to maintain safety and meet fire codes during construction. Per building codes, the center could not have occupancy if a temporary fire system was not in place during the mechanical upgrades. 

Design specifications dictated that the temporary system handle a flow of 1,250 gallons per minute (GPM) with 70 PSI of inlet pressure and 160 PSI of outlet pressure. The system also needed to automatically activate upon pressure drop. 

Local fire protection contractor Superior Fire Protection, Inc., reached out to Xylem to develop a temporary fire protection solution with a relatively quick turnaround. 

“When it comes to mechanical upgrades, the availability of new equipment and long lead times can make it hard for contractors to pin down a construction schedule,” says Andrew Culver, an outside sales representative for Xylem.

After assessing the situation, Xylem identified the Godwin HL200M pump as the best solution. Xylem engineers designed the system with a Godwin HL200M 6-inch diesel-driven pump, which offers flow rates up to 2,540 GPM and has the capability to handle discharge pressures of 139 PSI. A pressure reducing valve was installed on the inlet to control street pressure, and a Godwin PrimeGuard 2automatic pressure controller was added to activate the pump in case of a drop in pressure. The PrimeGuard 2, which programs the pump to run only when needed, eliminated the need for expensive, onsite personnel to monitor pumps manually.

Within two weeks of the contractor contacting Xylem Rental Solutions, a temporary fire protection solution was delivered, installed, tested and brought online. The temporary fire protection system remained in place for four weeks during permanent system upgrades without incident.



April 28, 2021


Topic Area: Project News for Healthcare Facilities


Recent Posts

Rethinking How Healthcare Facilities Fund Construction Projects

Rising costs and competing priorities are driving healthcare organizations to explore new financing arrangements and construction strategies.


Winners Named for the 15th Annual Healthcare Design Awards

All winners will be honored and the Best of Competition and Transformation and Innovation Award recipients will be announced during a celebration on November 12.


Intermountain Health Breaks Ground on New Children's Hospital in Nevada

Plans call for a 33-acre campus, an approximately 828,600-square-foot hospital with an initial 180-bed inpatient tower that can expand to 228 beds.


Ambulatory Care Facilities Reshape FM Strategies

Facilities management playbooks were written for acute care facilities, but ambulatory sites require a different approach.


Intermountain Foundation Receives $150M Gift for Children's Hospital in Nevada

Intermountain Health Felicia and Ben Horowitz Children’s Hospital is expected to open in 2030 at the UNLV Harry Reid Research and Technology Park in southwest Las Vegas.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.