Compact, Powerful Model DRZ with Quick-Grip Chuck Offers Maintenance Pros Quick, Clean, Quiet Drain Cleaning


The new Model DRZ economical power drain cleaner from General Pipe Cleaners quickly and cleanly clears clogs from 1-1/4" to 3" sink, tub and laundry lines. 

Fast and easy to use, it’s perfect for maintenance pros. The patented Quick-Grip™ chuck lets you quickly grip or release the cable with just a quarter turn. Three chuck jaws securely hold 1/4", 5/16" and 3/8" Flexicore® cable for a wide range of small-line jobs.

No need to wear-out your arms holding a heavy machine over the drain or under the sink. Light and powerful for its size, the compact design of the Model DRZ lets you operate the machine horizontally on the kitchen counter – or vertically on the floor next to the bathtub. Use the pneumatic pedal to keep your hands free to control the feed and guide hose. 

The tough impact-resistant plastic drum carries up to 50' of 1/4" or 5/16", or 35' of 3/8" Flexicore® wire rope center cable. Transport the lightweight machine to and from jobs with its convenient carrying handle. And the silent motor won't disturb others. 

General also offers the new Model DRZ-PH with a variable speed power cable feed for optimal feeding and retrieving at up to 16 feet per minute. The 4-foot guide tube means you never have to touch the cable. So your hands – and the jobsite – stay clean. 

The rust-resistant aluminum drum on the Model DRZ-PH includes General’s quick-change cartridge system to easily switch between different diameter cables without pulling messy cables from the drum.

Flexicore® cables are made of heavy gauge wire tightly coiled around 49-strand aircraft-type wire rope and heat-treated. The industry standard for drain cleaning snakes, Flexicore cables offer unequalled strength – and the right amount of flexibility. 

For more information, contact the Drain Brains® at General Pipe Cleaners at 800-245-6200 or 412-771-6300, or visit www.drainbrain.com

 



March 9, 2017


Topic Area: Press Release


Recent Posts

Reframing the Construction Manager as a Community Manager

Managers must work with patients, community residents and other interested parties to ensure a smooth, successful construction projects


Health First Celebrates 'Topping Off' Ceremony for New Cape Canaveral Hospital Campus

Construction is slated to finish by the end of 2026 or early 2027.


The University of Hawai'i Cancer Center Caught Up in Cyberattack

Investigations are still ongoing to assess other sensitive information that may have been impacted.


Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.