Double Door ULTIMATE Enclosures Introduced


Wiegmann introduces double door versions of their N412 ULTIMATE series electrical enclosures. These enclosures protect electrical components in harsh, dirty environments.
 
Wiegmann, part of Hubbell Commercial Construction, provides innovative electrical products to OEM, industrial and commercial markets. These new double door wall-mount enclosures complement Wiegmann's ULTIMATE series single door product line. Removable, interchangeable doors feature concealed hinges. In addition, a removeable center post provides easy access to components and for installing back panels. The cULus Listed Double Door N412 series are NEMA 4 rated. They also meet NEMA type 3R, 12 and 13 along with IP66 standards.
 
Additional N412 enclosure features include:
  • Constructed of carbon steel with continuous welded seams and powder coat finish
  • Doors sealed with poured-in-place gaskets
  • Mounting holes located in the back of the enclosure 
  • Grounding studs welded to doors and body
  • Collar studs provided for mounting optional ULTIMATE series back panels 
  • Quarter-turn semi-flush latch included

    Wiegmann's new enclosures are available in thirteen different sizes. Designed for use where dirt, dust, oil, water and other contaminants are present. Typical applications include municipal infrastructure, water treatment plants and other industrial or commercial facilities. Availability of Wiegmann N412 series double door enclosures begins late July 2019. Find more information at www.hubbell.com

 

 



July 17, 2019


Topic Area: Press Release


Recent Posts

Reframing the Construction Manager as a Community Manager

Managers must work with patients, community residents and other interested parties to ensure a smooth, successful construction projects


Health First Celebrates 'Topping Off' Ceremony for New Cape Canaveral Hospital Campus

Construction is slated to finish by the end of 2026 or early 2027.


The University of Hawai'i Cancer Center Caught Up in Cyberattack

Investigations are still ongoing to assess other sensitive information that may have been impacted.


Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.