Dual-Lite launches recessed ceiling-mount indoor LED


 Hubbell Lighting, a world leader in lighting innovation, announced that Dual-Lite has launched its new EV4R Series - a recessed, ceiling-mounted, emergency light with superior emergency lighting coverage.

"We are seeing a significant increase in specified projects where low profile, non-intrusive emergency lighting is a requirement," said Rob Papstein, senior product manager at Dual-Lite. "Architects will agree that the most appealing emergency light is the one that's invisible. Specifying engineers, lighting designers and facility managers will be pleased with the architectural design of the EV4R."

While the design community will enjoy the embedded EV4R design that reveals less than 3/16"  below the ceiling plane, specifiers will be excited to see it offers exceptional emergency lighting performance – up to 42’ spacing on mounting heights from 9’ to 12’.  Typical recessed emergency fixtures hang 6" below the ceiling plane and must be spaced 12' apart to meet Life Safety Code requirements. And customers now have the option of using  a rectangular or round trim-plate included with each fixture, in white or black finish to help complement the compact, low-profile design.

Features & Certifications:

·       Round or rectangular trim-plate in white or black finish

·       Flame-rated, UV stable thermoplastic housing, IC rated

·       Four LEDs housed within an aluminum heat-sink

·       Individual LEDs are driven at 1 watt each for 88 lumens per LED

·       UL924 damp location listed, NFPA 101 and NFPA 70

·       Temperature Range: 50 ̊ to 104 ̊F (10 ̊ to 40 ̊C)

 

 

 



April 14, 2016


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.