Emerson Network Power premieres first, transfer switch-based, multi-feature packaged paralleling system with load management


Emerson Network Power, a business of Emerson (NYSE: EMR) and the world’s leading provider of critical infrastructure for information and communications technology systems, premieres the ASCO® Series 300 Generator Paralleling System — the first transfer switch-based, multi-feature packaged power system with load management for mid-tier installations.

"We integrate ASCO’s core IP/technology with sophisticated field-proven controls and load management expertise to give our customers an affordable, pre-engineered product that’s robust, compact, and highly effective,” said Brian Escott, vice president of ASCO the global leader in transfer switches and generator paralleling switchgear.

The ASCO Series 300 packaged power system incorporates a reliable, high-endurance ASCO Closed Transition Transfer Switch mechanism that represents a patented and innovative approach to paralleling. The system combines the transfer mechanism with the most sophisticated ASCO load distribution and control technology originally developed for mission-critical, highly-engineered installations. Emerson Network Power scaled the control technology for this standard design, which is available from 208 to 600 volts.

The ASCO Series 300 system can be configured quickly for fast-track delivery because it eliminates job-specific engineering for either prime or emergency power applications that require paralleling two, three or four gen-set installations. It can synchronize, parallel, and provide load sharing for a wide range of gen-sets, of different sizes and manufacturers using bias signals to the voltage regulator and governor. This provides needed flexibility to facility managers when they plan power expansions and equipment replacement.

The ASCO Series 300 feature set includes load bus optimization, generator load demand, and generator power metering for controls that satisfy the requirements of distributed data centers, healthcare, commercial and telecom operations, oil and gas processes, and government, agriculture, public and educational facilities.

ASCO Series 300 features that ensure power continuity from automatic controls include manag­ing generators by runtime usage, assigned priority, or load requirements, and distributing power by load prioritization. The system also can manually add and shed loads, manually start gen-sets and connect to the load bus.

The efficient, intuitive operator touch screens provide fingertip access to data and graphics designed to provide monitoring and control with minimal navigation.  Screens include metering, event and alarm logs, bus optimization and load demand set up, and manual paralleling. Password protection allows individual account management and auditing as well as privilege assignments.

The ASCO Series 300 Paralleling System is a member of the proven family of ASCO Generator Paralleling Systems, is UL 891 listed and addresses a wide range of end uses and applications, and is supported with world-class technical support and field service.

See the ASCO Series 300 Generator Paralleling System brochure, or call (800) 800 ASCO (2726), email CustomerCare@Asco.com, or visit EmersonNetworkPower.com/ASCO for more information.

 



August 24, 2015


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.