Evolution Series hinged wall box from Legrand offers quick access to power, data, and A/V in multi-function spaces


As part of the Evolution Series of floor, wall and ceiling boxes, Legrand has introduced a new Wiremold® hinged wall box designed to provide quick and easy access to power, data and A/V connections. It is available in 4-gang and 8-gang configurations and is ideal for both remodel and new construction projects. 

The hinged wall box is designed for large spaces such as lecture halls, ballrooms and conference rooms where frequently changing events often require a unique mix of power, data and A/V services. Legrand Senior Product Manager Michael Cole, said, “With the hinged wall box, users can quickly connect and disconnect power, data and A/V cables according to what the event requires. And, as an added benefit, whether the box is in use or not, the locking cover prevents unauthorized access.”

The hinged main door opens a full 180 degrees to provide convenient access. Boxes are designed to fit into standard 2" x 4" wall construction. Trade size knock-outs range from ¾" to 2" on the bottom and side.

A small egress door in the front of the box allows wires and cables to exit while the main door is secured. These all-steel boxes are painted white inside and out and can also be painted to coordinate with wall colors. A black painted version is also available.

 



June 5, 2015


Topic Area: Press Release


Recent Posts

Making AI Work for Predictive Maintenance

AI can support predictive maintenance by helping managers anticipate equipment failures, reduce downtime and improve operational efficiency.


Thomas Jefferson University Unveils Plans for Sidney Kimmel Medical College in Allentown, PA

Located at One Center Square, in downtown Allentown, the campus will include more than 54,000 square feet of newly constructed medical education space.


Aspirus Chippewa Falls Hospital and Clinic to Open in September

The approximately 35,000-square-foot facility is designed around the needs of patients and families, bringing together hospital, clinic and diagnostic services in one location.


Respecting EVS Workers: 19 Minutes Is Not Enough

The infection control problem is time, and it's up to facility managers, EVS directors and infection preventionists to address the problem.


Where are the Greenhouse Gas Emissions Hotspots in Healthcare?

First-year findings from Boston Medical Center show medical waste generates a disproportionate amount of healthcare emissions.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.