Evolution Series hinged wall box from Legrand offers quick access to power, data, and A/V in multi-function spaces


As part of the Evolution Series of floor, wall and ceiling boxes, Legrand has introduced a new Wiremold® hinged wall box designed to provide quick and easy access to power, data and A/V connections. It is available in 4-gang and 8-gang configurations and is ideal for both remodel and new construction projects. 

The hinged wall box is designed for large spaces such as lecture halls, ballrooms and conference rooms where frequently changing events often require a unique mix of power, data and A/V services. Legrand Senior Product Manager Michael Cole, said, “With the hinged wall box, users can quickly connect and disconnect power, data and A/V cables according to what the event requires. And, as an added benefit, whether the box is in use or not, the locking cover prevents unauthorized access.”

The hinged main door opens a full 180 degrees to provide convenient access. Boxes are designed to fit into standard 2" x 4" wall construction. Trade size knock-outs range from ¾" to 2" on the bottom and side.

A small egress door in the front of the box allows wires and cables to exit while the main door is secured. These all-steel boxes are painted white inside and out and can also be painted to coordinate with wall colors. A black painted version is also available.

 



June 5, 2015


Topic Area: Press Release


Recent Posts

What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Skills Gap Remains Wide in Facilities Management

Many candidates lack the skills that are needed to be a facilities manager.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.