Family-centered design at Nemours Alfred I. duPont Hospital for Children features nora rubber flooring


When administrators at Nemours Alfred I. duPont Hospital for Children, in Wilmington, Delaware, selected furnishings and finishes for the hospital’s 450,000-square-foot expansion, they took to heart the many opinions and wishes that families, children and caregivers shared with them. The result is a hospital designed for and planned by children and families that promotes emotional, and physical healing, featuring noraplan environcare™ and noraplan® sentica in corridors, patient rooms, work stations, clinical spaces and waiting rooms.

Opened last October, the world renowned, full-service children’s hospital sees 7,000 people through its outpatient doors and 5,000 individuals through its inpatient doors on a daily basis. Highlights of the expansion include 144 single-patient rooms, an expanded emergency and pediatric intensive care unit, the soaring five-story Anthony N. Fusco, Sr., Atrium, a rooftop healing garden and the interactive Discovery Zone presented by duPont.

When it came to selecting a floor covering that supports the family-centered design, administrators turned to nora flooring for a variety of reasons, among them slip resistance. “When we look at the rubber flooring, it does give us a much steadier surface,” said Kay Holbrook, associate administrator at Nemours. “Knowing there is a slip resistance there is a real plus. Putting that in our building was a pro-active step we could take.”

The floor’s acoustic properties were equally important. Colleen Davis, director of special projects at Nemours, recalled being part of the construction of the hospital’s neonatal intensive care unit in 2007. “We selected nora flooring for that very reason—acoustics. It does absorb noises, and that’s very important for patients, who are trying to sleep and get better.”

Administrators also appreciate the floor’s simple maintenance regimen, which is especially important in a facility that operates 24/7. “In a children’s hospital with full occupancy, we don’t have opportunities to wax and then remove the wax material,” said Arthur Brinkworth, construction project manager. The absence of wax, strippers and other harsh cleaning products contributes to improved indoor air quality. “We really like the maintenance-free aspects of nora.”

“And from an infection control standpoint, the single flooring tiles can be heat-welded, so there are no cracks or crevasses that bacteria can get into and contribute to an unsafe environment,” added Davis.

According to Holbrook, “The environment really matters to a family, because a hospital room represents their home. So what that environment looks like, how it feels, how it comes together, how thoughtful it is really can make the difference for a family. We’ve received great feedback. Our patient satisfaction scores have gone up as a result of the environment, and the flooring is part of that environment.”

To view a brief video about the use of rubber flooring in the hospital, visit the nora website at www.nora.com/us/. A written project brief describing the project in greater detail is also available on the website.



November 10, 2015


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.