Flexibility Key for Future HVAC System Design

COVID-19 can spread via aerosol transmission, so controlling airflows is critical

By Dan Hounsell


HVAC systems in healthcare facilities have become critical components over the last six months as managers have sought to stop the spread of the coronavirus and protect patients and staff. As the pandemic moves into its second year, managers now must incorporate lessons learned into the design of future facilities.

Several studies have indicated that COVID-19 can spread via aerosol transmission, meaning that control over airflows in healthcare facilities is critical, according to Hospital and Healthcare.

Simon Witts, principal engineer at LCI Consultants with more than 34 years’ experience in health building design, says it’s important for healthcare facilities managers to consider what a facility is trying to achieve. Guidelines need to be followed for critical care areas in relation to airflow systems, and it’s important not to make a knee-jerk reaction and design everything for the current pandemic at the expense of other functions. Facility designs need to in-build system flexibility.



May 3, 2021


Topic Area: HVAC


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 