Formulating a plan for deferred maintenance

Upgrades to facilities can overcome scarce resources to deliver financial benefits


Orange County, Fla., faced a dilemma in 2012 that is familiar to maintenance and engineering managers: Many of its more than 400 facilities were showing their age, maintenance costs were rising, and resources to address the issues were getting thin, according to an article from Facility Maintenance Decisions on the FacilitiesNet website.

A decision was made to create a plan to determine a course of action to both contain these rising expenses and build a long-term solution for sustainability. The result was an impressive reduction in utilities.

With that many facilities, needing so much attention, the Orange County team faced the task of fully assessing upgrade needs and determining priorities, given their limited resources. They broke the upgrade plan assessment into several components:

• Needs analysis

• Energy assessment

• Controls analysis

• Certification and compliance

• Costing and recommendations

Read the article.

 

 



January 4, 2019


Topic Area: Energy and Power


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.