GLO-STICK leak detection kit finds all leaks in small to medium sized AC&R systems


Leaks in air conditioning and refrigeration systems cost the industry millions of dollars every year. Most are discovered only after a loss of cooling leads to discomfort, spoilage or production difficulties. Spectronics Corporation manufactures a variety of kits to detect even the most elusive refrigerant leaks.

The Spectroline® OPK-40GS/E GLO-STICK® Kit contains everything needed to locate all AC&R leaks in small to medium sized systems — including high-pressure R-410A systems. Technicians will appreciate the convenience of the single-dose fluorescent dye capsules, which allow adding refrigerant and fluorescent dye in one simple step.

The anchor of the kit is the OPTIMAX™ 400 leak detection flashlight. Its high-output violet light LED enables dyes to fluoresce more brightly and with greater contrast compared to conventional blue light lamps. The OPTIMAX 400 has power equal to high-intensity 150-watt lamps, and an inspection range of 25 feet (7.6 m) or more.

The OPK-40GS/E Complete GLO-STICK kit also includes:

Four universal/POE GLO-STICK® dye capsules

Bleed valve

Purge capsule

Hose/coupler with check valve, low-loss and purge fittings

8 oz (237 ml) spray bottle GLO-AWAY™ dye cleaner

Fluorescence-enhancing glasses 

All components are packed in a rugged carrying case. The kit treats up to 50 lbs (22.7 kg) of refrigerant, 4 gallons (15 L) of lubricant, or 24 tons of cooling.



February 16, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.