Geisinger Medical Center Expansion Project Announced

The $880 million project is slated to be complete and open in 2028.

By HFT Staff


Geisinger officials announced major plans to make better health more accessible for the central Susquehanna Valley and beyond with a proposed $880 million expansion of Geisinger Medical Center. 

The proposed project will feature a new 11-story tower that will be constructed at the front of the hospital, near an expanded main entrance area. This expansion will dramatically alter and improve the Geisinger Medical Center campus through modern spaces and tools to meet the region’s current and future healthcare needs, focusing particularly on patient experience and high-level care. 

The new tower will feature a larger emergency room to serve more patients and provide a more efficient flow of care. The new ER will double the square footage of the current space and increase it from 45 beds to 60 beds. Updated and expanded intensive care units and operating suites will surround the ER to allow collaboration between teams as they care for the sickest and most severely injured patients. 

The hospital will transition to a 100 percent private-room facility for a more comforting and modern healing environment, so each patient will have their own room to recover and be with their loved ones. It also allows more space for teams to work collaboratively on a patient’s care plan. 

Beyond the clinical expansion, the project improves campus convenience with a proposed multi-level parking garage near the front of the hospital. The garage will connect to the hospital with an enclosed sky bridge, offering patients and visitors an easy way to reach the facility and its emergency services. The parking garage also will better connect the hospital with the Pine Barn Inn, which will continue operations adjacent to the hospital.  

This expansion marks the latest investment in the region’s health needs. The system recently started construction on Geisinger Behavioral Health Center Danville, a 96-bed inpatient facility in Mahoning Township that’s expected to open in 2025.  

Danville’s project is happening in parallel with a similar expansion at Geisinger Wyoming Valley Medical Center near Wilkes-Barre. These investments underscore Geisinger’s commitment to creating a better patient experience for northeastern and central Pennsylvanians. 

Geisinger Medical Center campus development work is already underway, with a roadway project in front of the hospital that will improve traffic flow. The Danville expansion project is expected to begin in 2025, starting with the planned demolition of Dickey Clinic to make room for the tower. Tower construction will occur in phases with the new tower slated to open in 2028. The last expansion on the campus occurred in 2010 with the opening of the Hospital for Advanced Medicine tower. 



July 11, 2024


Topic Area: Construction


Recent Posts

The Fatal Flaws in Active Shooter Response in Healthcare Facilities

The most effective solutions to workplace violence are sophisticated emergency response planning and master level training for all employees.


Utah Hospital Outage Highlights Backup Power and Resiliency Challenges

The hospital went without power for nearly two hours.


Ground Broken on New North Dakota State Hospital

The 300,000-square-foot facility in Jamestown will provide 140 beds in a modern, trauma-informed care environment.


Form Your Pit Crew: Key Takeaways From the 2025 Healthcare Innovations Conference

The Healthcare Innovations Conference brought together healthcare facility managers from across the country to collaborate on industry issues.


Glens Falls Hospital Caught Up in Oracle Health Data Breach

As of November 2, 2024, Glens Falls Hospital no longer uses Oracle Health/Cerner as its electronic health record vendor.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.