Going Solar with No Upfront Costs

300 kW solar system and roof upgrade delivered with no upfront cost for medical center association.

By HFT Staff


The Foothill Medical Center Association in Foothill Ranch, California, recently energized a 300 kW rooftop and carport solar system at its commercial property, completing a combined solar and roof modernization delivered with a fully financed power purchase agreement. 

The newly installed system is forecast to generate approximately 506,000 kWh of clean electricity annually, offsetting a substantial portion of the center’s Southern California Edison load under the GS-2-TOU tariff. This is expected to reduce carbon dioxide emissions by around 359 metric tons annually, equivalent to removing 78 gasoline-powered passenger vehicles from the road each year. 

HFT Recommends: Where Backup Power Meets Sustainability in Healthcare Facilities

For many commercial owners associations, going solar looks attractive on paper but is complicated in practice. The roof is often the biggest obstacle. Installing a solar array designed to operate for 25 years on a roof nearing the end of its service life forces an expensive sequence: Strip the array, replace the roof, and re-install the array. Foothill Medical Center Association was able to avoid this issue. 

The project was financed by Sunrock Distributed Generation, developed by WattHub Renewables and built by SunRenu Solar. Under the agreement, the association received a fully operational solar system and comprehensive roof reconditioning across all solar-supporting buildings with no upfront cost. 

WattHub Renewables structured the project so the economics of the power purchase agreement could support the solar installation and roof reconditioning. SunRenu Solar executed the scopes simultaneously, delivering a coordinated roof-and-solar project designed for long-term performance. The result is a cleaner, lower-cost energy solution paired with a roof system under warranty, delivered without requiring the association to fund the work upfront.



July 28, 2026


Topic Area: Sustainable Operations


Recent Posts

Creating Healthcare Campus Master Plans That Allow Movement and Respite

A thoughtful campus master plan looks beyond buildings to the corridors and transitional spaces that shape how people experience healthcare environments.


Aspirus Health Celebrates Opening of Chippewa Falls Hospital and Clinic

The new facility combines hospital and clinic services in one location and is designed to support patients with coordinated, patient-centered care.


AdventHealth to Open Aurora Highlands Medical Campus

AdventHealth Aurora Highlands includes a 24-hour freestanding emergency room, outpatient imaging and clinic services.


The Future of Healthcare Facility Construction Projects

Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.


Arnprior Regional Health Upgrades Building Controls to Improve IEQ

Case study: They wanted to improve the hospital facility’s IEQ to support patient care and reduce long-term operating costs.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.