Greenheck Expands Automatic Balancing Damper Line


Greenheck has added two new products to its automatic balancing damper (ABD) line. Model ABD-FD incorporates a UL 555 rated 1-1/2 or 3 hour static fire damper, flanged sleeve, an ABD and an optional factory-supplied grille. The entire ABD-FD assembly is UL rated and approved and can be used in both supply and exhaust applications.  Ceiling radiation damper CRD-1WT, UL classified for wood truss floor/ceiling assemblies, now has the option to add an ABD mounted in the plenum box.

Pressure independent automatic balancing dampers are designed to maintain constant airflow volume in HVAC applications. The damper blade is calibrated to automatically adjust to changing pressures.

Greenheck, the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment, offers the most UL certified dampers and the largest selection of AMCA licensed dampers in the industry.                                                                                                                                                           

 



July 23, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.