Greenheck expands Model EQB line of mixed flow inline fans


Greenheck’s line of Model EQB mixed flow inline fans designed to provide higher efficiency and lower sound levels has expanded with the addition of five new sizes. Now available in eleven sizes, 9 through 33, Model EQB offers a performance range up to 26,000 cfm and static pressure up to 3 in. wg. All Model EQB sizes are licensed to bear the AMCA Seal for Sound and Air Performance.

Model EQB’s unique octagonal housing is manufactured of formed galvanized steel panels coupled with a heavy-gauge steel drive frame that provides exceptional strength and durability. An aluminum mixed flow wheel ensures maximum efficiency and low sound levels. Standard universal mounting supports, field-rotatable housing, and removable duct collars allow for easy installation. Model EQB is recommended for indoor, commercial clean air applications where quiet, economical operation is desired. Typical installations include office buildings, educational facilities, libraries, hospitals, concert halls and parking garages.

Greenheck is the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment. 

For more information about Greenheck products, visit www.greenheck.com.



March 7, 2016


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.