Greenheck’s Energy Core Ventilator Line Continues to Grow


Energy Core Ventilators (ECV) from Greenheck transfer both sensible (heat) and latent (moisture) energy between the exhaust and supply airstreams without the airstreams mixing. The energy recovery core separates the supply and exhaust air, ensuring only fresh air is introduced into the indoor space while providing superior heat transfer and moisture permeability.

Model ECV-PM, the latest addition to Greenheck’s ECV line, features an AHRI 1060-certified polymer membrane energy recovery core manufactured from corrugated aluminum sheets used to separate the polymer membrane layers. The new polymer membrane energy core allows for low air-side pressure differentials, increasing ECV airflow capacity by 15% per housing size versus a fiber membrane. The polymer and aluminum material provides increased thermal effectiveness and allows for easy washable maintenance. Designed for indoor and outdoor mounting for commercial applications requiring 500 to 3,750 cfm of ventilation air and up to 1 in. wg, the ECV-PM is ideal for office buildings, schools, hospitals, churches, dormitories and nursing homes.

Greenheck is the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment. 

For more information, contact Greenheck, P.O. Box 410, Schofield, WI 54476-0410, (715) 359-6171, FAX (715) 355-2399 or visit www.greenheck.com



October 18, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.