HITEC Power Protection introduces the market’s most efficient UPS power solution


HITEC Power Protection, the inventor of Dynamic UPS, today announced the availability of its Power PRO series. The new UPS power solution now becomes the most efficient option available for mission-critical facilities, offering a 20 percent energy consumption improvement equating to the greatest reliability and uptime available.

“This is a major breakthrough for continuous power solutions and the natural technology choice for critical loads exceeding 1.5 MVA,” said Ranjan Misra, President of HITEC Power Protection, North America. “We have incorporated 60 years of UPS experience into designing the Power PRO series, our best ever continuous power solution.”

The HITEC Power PRO series delivers the lowest possible TCO and ensures the highest quality of uninterruptible continuous power for mission-critical applications; it is the new standard for Continuous Power. Additionally, the new UPS solution offers:

·      A 17 percent reduction in footprint.

·      The most compact power solution in today’s market.

·      Innovative battery-free design that increases reliability, saves space, and minimizes environmental impact. 

·      Intuitive communication for unrivalled connectivity, system monitoring and reporting to meet the demand for customer support.

 

 



October 23, 2015


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.