HVAC Designed for Versatility and Energy Efficiency


With the smallest footprint in the industry, Daikin’s new OptiLine is the ideal solution when livable space is at a premium.

Engineered for high-rise apartments, office buildings, dormitories, and hotels, OptiLine provides new levels of quiet, comfortable, and economical heating and cooling in a very slender package. Daikin engineers designed OptiLine to efficiently condition air from 300 to 1200 cfm, optimally matching a building’s space restrictions and efficiency needs.

OptiLine leverages top efficiency to meet building owners’ environmental requirements and budget demands. Using the lowest amount of energy possible, OptiLine can reduce energy costs by 30 to 50 percent compared to similar products currently on the market.

Indoor air quality is a top concern and Daikin takes occupant comfort to the next level with OptiLine. With its variable speed motorized impeller the fan is able to run at the lowest possible RPM, typically reaching less than 60 percent capacity. This unmatched fan efficiency allows OptiLine to achieve noise criterion (NC) of less than 30 for the space, and to control humidity levels to create the most comfortable space for occupants.



January 7, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.