HVAC/R Install Kit from UV Resources Streamlines Ultraviolet Lamp Fixture Mounting


The new UV-C Fixture Installation Kit from UV Resources provides extruded aluminum vertical supports designed to speed contractor installation of Ultraviolet Germicidal Lamps in HVAC/R systems.

Besides the framing supports, the kit includes everything needed to install UV lamp fixtures in an air handler plenum, including lamp holder bracket, ceiling gusset, self-tapping screws and hardware and leveling feet. For added installation flexibility, the two ~60-inch vertical supports can be “spliced” together to expand to accommodate plenums up to ~120 inches tall or cut for smaller applications. The installation kit can support multiple UV-C fixtures.

“The installation kit provides installers with everything they need to install UV-C fixtures,” says Dan Jones, president of UV Resources. “Installation time spent sourcing installation materials is therefore eliminated.”

For more information and a high resolution image for download, please visit  http://www.uvresources.com/news/press-releases/hvacr-installation-kit-from-uv-resources-streamlines-ultraviolet-lamp-fixture-mounting/



March 1, 2018


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.