Handheld vane anemometer/psychrometer offers 8-in-1 functionality


 

(New York, NY)  The new Mini-Anemometer/Psychrometer with CFM/CMM & Enthalpy (DAF3009) from General Tools & Instruments (General®) is ideal for HVACR technicians and contractors. It offers the ability to measure eight HVACR-related parameters in one handheld device that is small and light enough for one-handed operation.

The DAF3009 can measure all parameters associated with installing, testing and fine-tuning the performance of an HVACR system:

· Airflow Volume (in CFM or CMM)

· Air Speed (in ft/min, m/sec, km/hr, mph or knots)

· Enthalpy (in BTU/lb or kJ/kg)

· Ambient Temperature

· Dew Point Temperature

· Wet Bulb Temperature

· Wind Chill Index

· Relative Humidity

The instrument not only can measure air speed and airflow volume, but also can track and calculate the maximum, minimum and average values recorded over a measurement “session.” A session begins when the device is powered on and ends five minutes after the final measurement is made (when the Auto Power Off function activates). This capability is helpful for a variety of purposes, such as determining the fastest and slowest fans in a group or the average of a group of fans.

The DAF3009 also features a large backlit dual-readout LCD, a vane and sensor cap and a tripod mount. It offers the following measurement ranges and accuracies.

· Airflow Volume: 0 to 591,000 CFM (0 to 16,740 CMM); +/-3% typical

· Air Speed: 80 to 5910 ft/min (0.4 to 30 m/s); +/-3% typical

· Enthalpy: -8 to 318 BTU/lb. (-19 to 740 kJ/kg)

· Ambient Temperature: 32° to 122°F (0° to 50°C) ; +/-1.8°F (1°C) typical

· Dew Point: -67° to 122°F (-55° to 50°C)

· Wet Bulb: -31° to 122°F (-35° to 50°C)

· Relative Humidity: 0 to 100%; +/-3% typical

 

 



December 8, 2014


Topic Area: Press Release


Recent Posts

Healthcare and Resilience: A Pledge for Change

Climate resilience and reducing environmental impact drive voluntary program targeting hospitals.


Texas Health Resources Announces New Hospital for North McKinney

Expected to open in 2028, the hospital will feature 60 beds initially with plans to double in capacity to accommodate for future community growth.


Cedar Point Health Falls Victim to Data Breach

Cedar Point Health has no evidence directly linking this incident to specific incidents of financial fraud or identity theft.


Fire Protection in Healthcare: Why Active and Passive Systems Must Work as One

Sprinklers, smoke compartments and firestopping can form an interdependent safety strategy.


Cleveland Clinic Hits Key Milestones for Palm Beach County Expansion

These include plans to begin demolition of current structure and hospital site preparation in 2026 and open the outpatient center and ambulatory surgery center in 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.