Honeywell Expands Line of Fire-Lite Addressable Fire Alarm Control Panels


Honeywell is expanding its line of Fire-Lite addressable fire alarm control panels to give safety professionals more options for designing small to medium-sized fire systems. The Fire-Lite Endurance Series offers two new fire alarm control panels – the ES-50X and ES-200X – that feature dual-path communications, programmable buttons and support for combined fire and CO addressable detection.
 
The Endurance Series offers more communication options with the choice of built-in IP and POTs for dual communications, as well as cellular side-cars for extended backup and added reliability. Both panels offer four programmable buttons to perform routine tasks quickly, and feature a USB port for easy programming and firmware updates.
 
The new panels offers simplified SWIFT® wireless operations featuring a built-in wireless display driver and annunciator saving the dealer time and money on installations. SWIFT® wireless systems simplify installation and are ideal for difficult-to-wire applications such as historically protected structures, buildings with high ceilings or other complex structures that require costly wiring.
 
“Reliability with simplicity is an important combination when it comes to protecting lives,” said Susan Adam, marketing director for fire systems, Honeywell Home and Building Technologies. “More options sometimes means more complexity for life safety professionals, but the Fire-Lite portfolio’s simplicity is a big reason for its large and loyal customer base. The new Endurance Series panels reflect that legacy as the next-generation of addressable fire alarm control panels.”
 
For more information on Fire-Lite’s leading brand of fire alarm systems, please visit https://go.firelite.com/EnduranceSeries-PR.
 

 



April 4, 2018


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.