Honolulu Medical Center Starts $1 Billion Expansion

Four-phase project will triple center’s existing size to 760,000 square feet and be a multi-year project

By HFT Editorial Staff


Straub Medical Center in Honolulu recently broke ground on a $1 billion redevelopment project for its current campus.The project will create a healthcare campus that will reflect the not-for-profit organization’s vision to transform healthcare by providing the space, tools and resources necessary to impact all aspects of patient health – prevention, treatment, access, and affordability.

Straub’s future healthcare campus will be nearly triple the existing size at 760,000 square feet and will be a multi-year project. The first phase of construction will begin with the parking garage. The second phase is the new medical center building, and the third phase will focus on the outdoor space with the creation of the porte cochere and landscaping. The final phase will be the renovation of the existing Straub Medical Center and the Strode Medical Building.

The Straub Medical Center redevelopment will be the largest undertaking of its kind by Hawaii Pacific Health. A certificate of need (CON) was approved for this project in April 2020. The CON was based on Straub’s investment in equipment and services for this new development and the way those will benefit the healthcare needs of Hawaii. The project received unanimous approval by the Honolulu City Council earlier this month.

The site for this new healthcare campus, which is more than 5 acres, has been decades in the making. Land acquisitions for this project, which began when the Straub Clinic was established, have been secured piece by piece dating back to 1926. Highlights of Straub’s new health care campus include:

  • A new medical center building that is more spacious and flexible, with larger patient and operating rooms, as well as additional space for the Emergency Department.
  • Increased efficiencies aided by the addition of new equipment and clinical technologies that will support quality patient care and result in shorter hospital stays and lower patient costs.
  • Design elements that will provide flexibility so the needs of patients in various circumstances can be addressed. This is reminiscent of the medical center’s response during the pandemic surge to expand hospital capacity.
  • Ambulatory facilities that will support care providers as they deliver outstanding results for patients.
  • Team-based care settings with telehealth rooms to provide patients with multiple alternative methods of care, which will increase access.
  • Space for complex care and chronic disease prevention programs that include comprehensive education and coordination of care.
  • A new parking garage with 1,650 stalls, replacing the existing 400-stall parking structure. It will be designed with the flexibility to convert up to six of the floors for expanded clinical services if the need arises. It will also be user-friendly with one-way traffic, all full-size stalls, no columns, and digital signage showing the number of available parking spaces on each floor.


December 20, 2021


Topic Area: Construction


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.