Blog / Focus: Facility Design

How to design and build what’s needed to meet organizational goals and strategies

It’s all about scoping the right concept before getting too far down the facility planning phase

By Curtis Skolnick / Special to Healthcare Facilities Today


Planners are often asked to test a facilities concept, define how much space it will take, and determine how much it will cost to complete. These questions are useful in the early concept phase of a project, but the basis for planning is missing; what am I solving for, and how does this potential “bricks and mortar” solution meet a defined service, market, or strategic need of the organization? It’s all about scoping the right concept before getting too far down the facility planning phase. 

Defining and documenting project scope (the project intention, goal, or purpose) at the outset and controlling scope throughout the planning and delivery process is essential to ensuring the project vision becomes reality. 

Ask yourself:

• What strategies and goals are we trying to achieve? 

• What is the scope of the envisioned project and how was it defined?

Clearly defining the project, then articulating the scope and rationale to the team is paramount prior to launch. Scope typically relates to:

• Meeting the demands of the organization’s patients (service area) 

• Cultivating a new or expanded service line opportunity

• Helping to improve throughput and operations

• Fixing an infrastructure or standard-of-care issue

• Scope control/communicating clear scope of work 

• Attaining successful project definition

Rushing into design and construction without clearly defining the project scope can lead to project delay and frustration later in the process. If each team member cannot clearly articulate the scope of the project, you should stop and get everyone on the same page. Establish measurable project goals early to stay on track.

Scope definition and documentation

A facility project is a tactical element of a strategic plan or the output of business plan; this plan is built on the mission, vision, and goals of the organization. An organization’s strategic plan should include:

• Mission and vision identification

• SWOT analysis (strengths, weaknesses, opportunities, and threats)

• Internal and external environmental analysis

• Identification of gaps between mission/vision and internal/external needs

• Service needs identification

• Market-based needs and capacity analysis

• Strategic financial analysis

• Measurable strategic goals

• Tactics to meet the strategic goals of the organization

The needs identified in a strategic plan or focused business plan drive the tactical need for a project—not the other way around. A well-conceived scope guides facilities master planning and the detailed programming and design phases of a project. 

The scope of the project also acts as the base to define the project budget. Scope and budget are inextricably linked and need to be constantly checked against each other. 

It’s imperative that the two balance relative to a complete financial analysis of the project. If the project doesn’t “pencil” from a return-on-investment (ROI) perspective, then you’ll need to adjust scope and budget to get the project in line financially and still meet the market and service delivery goals of the organization. 

If you conduct these analyses early, you have a better chance of making less costing changes if needed. As you move through the project delivery process, the ability to easily make changes decreases, and the cost of changes increases. Therefore, it’s important to appropriately define the scope, test it against the budget, and communicate and document it at the project outset.

Scope control 

Once scope is defined and clearly communicated to the project delivery team, it must be managed. Use scope control tools developed during the early planning phases and during each subsequent planning and design phase (master planning, space planning, schematic design, design development, and construction documents) to avoid scope creep. 

Scope creep refers to uncontrolled changes in a project’s defined scope. Typically, scope increases consist of new services, new features, or additional room elements without corresponding strategic or market demand justification. Avoid scope creep early by:

• Plan based on defined and justified needs rather than articulated wants

• Encourage stakeholder participation and plan based on facts and analysis to ensure buy-in from all parties

• Eliminate “pet” projects or elements with no financial strategic justification; this is “wish-casting” instead of “forecasting” and usually results in wasted finite resources at the expense of needed projects

• Clearly communicate scope to all key constituents and members of the project delivery team before embarking on detailed planning, design, and construction

• Track scope early and continue to track throughout the life of the project

Remember, you don’t need to eliminate scope changes all together. Sound strategic logic and rapidly changing market dynamics may dictate appropriate (controlled) changes to scope that are justified. Strong scope controls will identify acceptable variances and appropriately jump-start conversations as to the “why” for the changes. 

Scope increases may require additional resources (e.g. staffing, space, equipment, capital costs, time, and operational costs) which must be justified or they could potentially put the project at risk. 

A few thousand square feet of scope creep could add millions to your total project cost, create delays if changed late in the design process, and cause a few headaches along the way. Allowing scope creep without correlating demand and revenue may require additional staffing resources, equipment, and furnishings, and carries the long-term operational cost without the requisite return on investment. 

Interestingly scope can shrink too. Cutting revenue producing scope to make budget will have downward impact on potential ROI, the ability to meet service demand, and ability to offer services and recruit new staff. If a department is downsized to allow another area to grow and still remain within budget, make sure the downsized department is not rendered dysfunctional. If this happens, you may pay once the facility is operational. 

There is great risk and cost to unfettered scope creep and a poorly defined project; therefore, proper planning and controls must be in place to prevent your project from being derailed. Items to consider:

• Thoroughly understand the project vision and involve all stakeholders in defining and documenting the project scope

• Utilize tools to monitor and control scope, and track the departmental “units” (e.g. number of rooms) and departmental space

• Expect changes; develop processes and criteria to evaluate proposed scope changes and to decide which changes are necessary to fulfill the intended vision

• Start with acutely defining and documenting scope on the front end of the project. Control scope throughout the process to position yourself to control your project, instead of your project controlling you.

If you build it, will they come?

In summary, too often healthcare executives employ an “If you build it, they will come” mentality to a project. Sure, a new facility or space frequently have a halo effect and activity may spike initially. But if the services aren’t what the patient, caregivers, and physicians require, then they will stop coming. The analyses conducted in the planning phase will help to accurately define project scope; meet the strategic, market, and financial goals of leadership; and meet the needs of the healthcare organization’s community.

Curtis Skolnick is managing director at CBRE Healthcare.

 



June 19, 2018


Topic Area: Architecture


Recent Posts

Nearby Explosion Damages Avera St. Anthony's Hospital in Nebraska

No major injuries to patients or employees were reported.


Baptist Memorial Hospital-Collierville to Begin Expansion Project Construction

The expansion for the ICU is expected to be complete in the fall of 2025, with the emergency department to be complete a few months after.


Proofpoint and Ponemon Institute Release Third Annual Healthcare Cybersecurity Survey

The survey found that 92 percent of organizations surveyed experienced at least one cyberattack in the past 12 months.


Infection Control in the Splash Zone

Handwashing sinks have been a target for infection control improvement in hospitals and other healthcare facilities.


Disorderly Patient with Drugs Arrested at Brandon Regional Health Centre

The patient was found to be in possession of 7.5 ounces of cocaine.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.