Iredell Memorial Hospital to Break Ground on New Expansion

The expansion will increase the size of both the emergency department and critical care unit.

By HFT Staff


Iredell Health System will soon begin the first phase of its expansion at Iredell Memorial Hospital, increasing the size of both the emergency department and the critical care unit. 

Iredell Health System plans to expand the emergency department (ED) by 4,805 square feet and the critical care unit (CCU) by 11,195 square feet. The project will also include the renovation of the existing CCU. The ED will expand into the current emergency physician parking lot, and the expanded CCU will be built on top of that expansion. 

The ED expansion will include the addition of 10 new treatment spaces, including several new exam rooms, three spacious critical care rooms for patients needing that level of care upon entering the emergency department, as well as four secure behavioral health holding rooms, with a special entrance and exit for patient privacy. 

Iredell Memorial Hospital’s CCU currently has 16 rooms. After the expansion, the CCU will have 27 total rooms, with four rooms containing special bariatric ceiling lifts. The lifts make it easier for caregivers to safely lift and transfer all patients. Additionally, all 11 of the new rooms are capable of transforming into negative pressure isolation rooms, in case of the surge of a highly contagious disease, like COVID-19. In the second phase of the project, the existing CCU will be renovated with all new equipment, beds and larger patient rooms. 

The exterior portion of the expansion is expected to be completed in summer of 2024, with interior renovations completed by the end of 2024. 



April 14, 2023


Topic Area: Construction


Recent Posts

Severe Winter Weather: What Healthcare Facilities Must Prioritize

Prioritizing critical systems and strategies is key to protecting patients, staff and operations during severe winter weather.


Recovery Centers of America Opens New Facility in Florida

Spanning 19 acres, the campus will include seven buildings, a pond, an outdoor recreation area with a pool, a full basketball court and a rock-climbing wall.


Munson Healthcare Caught Up in Third-Party Data Breach

The vendor has determined through an investigation that, at least as early as January 22, 2025, an unauthorized third party gained access to personal health information.


From Downtime to Data: Rethinking Restroom Reliability in Healthcare

Manufacturers discuss the operational issues plaguing healthcare restrooms and how to shift maintenance from reactive to resilient.


LeChase Building Four-Story Addition to UHS Delaware Valley Hospital

It will consolidate services into a state-of-the-art Medical Neighborhood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.