Johnson Controls Develops New Sound Attenuator Designed Exclusively for YORK Air Handling Units


This innovative, patent-pending silencer delivers comparable performance levels in half the space of a traditional three-foot duct silencer. The product is optimized to target specific frequencies of sound generated by air handling units (AHUs).

This is the first silencer developed specifically for AHUs. These devices are exclusive to YORK® AHUs and can be validated to meet the performance claims of Air Conditioning Heating and Refrigeration Institute (AHRI) Standard 260.

“This groundbreaking product gives our customers a competitive level of sound attenuation while significantly reducing the AHU footprint,” said Paul Bauch, acoustics engineer, Johnson Controls. “It’s ideal for installations where sound intrusion could be an issue, such as schools, hospitals and offices.”

The bidirectional silencer offers superior sound insertion loss both upstream and downstream of the fan while minimizing flow noise. The device also produces minimal pressure drop to improve overall system efficiency by reducing energy consumption and lowering total cost of ownership (TCO). The device can be further optimized when paired with other YORK® AHU sound attenuation technologies.

 For additional information, please visit http://www.johnsoncontrols.com or follow us @johnsoncontrols on Twitter.



January 18, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.