Johnson Controls helps top public health system deliver better care at lower cost in new hospital


Doctors and nurses spend more time with patients at a top public hospital system in Indianapolis thanks in part to technology integration from Johnson Controls, a global multi-industrial company.  The Sidney & Lois Eskenazi Hospital in Indianapolis features integrated clinical, building and administrative systems to improve clinical care for more than 19,000 inpatients and hundreds of thousands of outpatients each year. The facility is the new flagship hospital campus of Eskenazi Health, one of the country’s largest public hospital systems.

“Patients are familiar with x-rays and stethoscopes during a visit to the doctor, but rarely consider that behind those hospital walls is a complex web of systems that work together to help doctors and nurses provide care,” said Brendon Buckley, director, healthcare integration, Johnson Controls. “Building technologies play an important role in delivering better healthcare at a lower cost.”

Technologies inside Eskenazi Health patients’ rooms, such as nurse call, heating, air conditioning, lighting and television, digitally communicate to improve care and safety inside the hospital. For example, security systems communicate with nurse call devices to alert staff if a patient or clinician needs help. Nurses also stay at the patient’s bed side longer with mobile access to medical records, such as medication.

“Our nurses and doctors need the right information at the right time to provide the best care possible for our patients,” said Lee Ann Blue, chief nursing officer and executive vice present of patient care services at Eskenazi Health. “This new facility is designed to give our clinicians the technologies and resources they need to treat patients safely and effectively.”

The integrated technology lowers energy and operational costs. The new facility is on track to become the first certified LEED® Silver hospital campus in Indiana, a prestigious standard in green building design.

HOK and Jacobs Engineering managed the design and construction of the more than 1.2 million square foot, 315-bed facility. The design and construction process leveraged a Johnson Controls Technology Contract to create a connected medical environment where more than 20 clinical, business and building systems communicate with over 40 interface points.

Technology contracting lowers initial construction costs and decreases long-term operational and utility expenses by converging individual systems into a single networking solution. The health campus will save critical resources by eliminating the need to manage multiple, duplicate or discrete systems under various vendors, contracts and proprietary protocols in the constantly-evolving technology marketplace.

The new hospital campus replaced Wishard Hospital and includes 19 operating rooms, an administrative building, an inpatient mental health unit, an outpatient care clinic, a 2,700-space parking garage, and a central utility plant.



April 28, 2015


Topic Area: Press Release


Recent Posts

A Cleaning Alternative: The Benefits of Steam Technology

Cleaning is essential in healthcare facilities, but traditional disinfectants have harmful chemicals. Researchers say that steam technology may be the solution.


Novant Health Gets Approval for New Hospital and Freestanding Emergency Department

The new facilities will elevate access to healthcare in North Carolina’s fastest-growing county.


Preparing Healthcare Facilities for Severe Thunderstorms

Hardening plans and collaboration with local stakeholders can aid in prep for severe weather.


University of South Carolina Opens New Brain Health Center

The center is aimed at expanding access to specialized care for patients with cognitive conditions.


NLCS Strengthens Safety and Compliance with Comprehensive Electrical Program

Case study: A renewed partnership with Siemens helps the senior living provider meet NFPA 70B standards, reduce risk, and enhance reliability across its communities.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.