KAI Finishes SSM Health Outpatient Center Expansion in Missouri

The recently completed 15,600-square-foot clinic is more than double the size of its previous space.

By HFT Staff


Having outgrown its existing primary care and physical therapy clinic, SSM Health turned to healthcare experts KAI to design and build a state-of-the-art, expanded outpatient center in Warrenton, Missouri. The recently completed 15,600-square-foot clinic is more than double the size of its previous space. 

SSM Health held a design competition requesting area architectural firms submit their ideas for the new facility. In a blind selection process based on initial design and budget, KAI was named the winner and contracted to provide architecture, interior design and construction services through the Design-Build project delivery method on the $4.3 million facility. KAI’s in-house engineering group also provided MEPFP document review. 

Located on a 3.6-plus acre lot along an Interstate 70 corridor, the highly visible SSM Health Medical Group building features a full-glass enclosure as its exterior focal point, an oversized canopy over its entrance, and a wood and stone façade to project a warm, inviting space. 

The facility's interior and its 18 exam rooms are infused with calming wood tones and natural light, all centered around a centralized workstation. The center’s physical therapy space includes both adult and pediatric gyms along with treatment rooms. A lab suite contains a waiting area, nursing station, lab draw space and a workroom. A large waiting lounge welcomes patients in a bright and calming space and support areas include offices, a shared workroom and a staff break room. 

Care was taken by KAI to specify sustainable, flexible and durable materials throughout the facility’s design. 

The newly constructed facility was designed with careful consideration given to accommodate potential future expansions, ensuring scalability and adaptability for evolving needs. 



May 16, 2024


Topic Area: Construction


Recent Posts

What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


HealthSource of Ohio and UC Health Partner for New Medical Office Building

Construction is anticipated to be completed in 2028.


NorthShore Health Centers Investigates Data Security Incident  

The organization became aware of suspicious activity on its computer network on or around Aug. 10, 2026, and took steps to secure its systems.


Healthcare Ransomware Attacks Reach Record High in Q3 2026

The report documented 306 ransomware attacks against healthcare organizations in Q3.


Bon Secours Mercy Health Acquires Fauquier Health

Fauquier Health is a 97-bed acute care community hospital serving Fauquier County and the broader Warrenton region.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.