KAI Finishes SSM Health Outpatient Center Expansion in Missouri

The recently completed 15,600-square-foot clinic is more than double the size of its previous space.

By HFT Staff


Having outgrown its existing primary care and physical therapy clinic, SSM Health turned to healthcare experts KAI to design and build a state-of-the-art, expanded outpatient center in Warrenton, Missouri. The recently completed 15,600-square-foot clinic is more than double the size of its previous space. 

SSM Health held a design competition requesting area architectural firms submit their ideas for the new facility. In a blind selection process based on initial design and budget, KAI was named the winner and contracted to provide architecture, interior design and construction services through the Design-Build project delivery method on the $4.3 million facility. KAI’s in-house engineering group also provided MEPFP document review. 

Located on a 3.6-plus acre lot along an Interstate 70 corridor, the highly visible SSM Health Medical Group building features a full-glass enclosure as its exterior focal point, an oversized canopy over its entrance, and a wood and stone façade to project a warm, inviting space. 

The facility's interior and its 18 exam rooms are infused with calming wood tones and natural light, all centered around a centralized workstation. The center’s physical therapy space includes both adult and pediatric gyms along with treatment rooms. A lab suite contains a waiting area, nursing station, lab draw space and a workroom. A large waiting lounge welcomes patients in a bright and calming space and support areas include offices, a shared workroom and a staff break room. 

Care was taken by KAI to specify sustainable, flexible and durable materials throughout the facility’s design. 

The newly constructed facility was designed with careful consideration given to accommodate potential future expansions, ensuring scalability and adaptability for evolving needs. 



May 16, 2024


Topic Area: Construction


Recent Posts

Selecting the Right Team for Healthcare Projects

Focusing on key criteria ensure design and construction teams deliver a facility that is safe, functional and tailored to a specific healthcare setting.


How the Ascension Ransomware Attack Happened

An employee mistakenly downloaded a malicious file.


Community Health Network Announces New Central Indiana Campus

The new 425,000-square-foot facility is expected to be completed in mid-2026.


Lighting and Wayfinding: Keys to Senior Independence

Lighting can make wayfinding more manageable in senior living communities.


RUHS and PMB Break Ground on The Wellness Village Project

The 445,000-square-foot integrated health village is slated for completion in 2026.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.