KAI Finishes SSM Health Outpatient Center Expansion in Missouri

The recently completed 15,600-square-foot clinic is more than double the size of its previous space.

By HFT Staff


Having outgrown its existing primary care and physical therapy clinic, SSM Health turned to healthcare experts KAI to design and build a state-of-the-art, expanded outpatient center in Warrenton, Missouri. The recently completed 15,600-square-foot clinic is more than double the size of its previous space. 

SSM Health held a design competition requesting area architectural firms submit their ideas for the new facility. In a blind selection process based on initial design and budget, KAI was named the winner and contracted to provide architecture, interior design and construction services through the Design-Build project delivery method on the $4.3 million facility. KAI’s in-house engineering group also provided MEPFP document review. 

Located on a 3.6-plus acre lot along an Interstate 70 corridor, the highly visible SSM Health Medical Group building features a full-glass enclosure as its exterior focal point, an oversized canopy over its entrance, and a wood and stone façade to project a warm, inviting space. 

The facility's interior and its 18 exam rooms are infused with calming wood tones and natural light, all centered around a centralized workstation. The center’s physical therapy space includes both adult and pediatric gyms along with treatment rooms. A lab suite contains a waiting area, nursing station, lab draw space and a workroom. A large waiting lounge welcomes patients in a bright and calming space and support areas include offices, a shared workroom and a staff break room. 

Care was taken by KAI to specify sustainable, flexible and durable materials throughout the facility’s design. 

The newly constructed facility was designed with careful consideration given to accommodate potential future expansions, ensuring scalability and adaptability for evolving needs. 



May 16, 2024


Topic Area: Construction


Recent Posts

Laser Scanning: Reducing Risk in Construction Projects

VDC technology allows teams to define scope based on verified conditions, not on assumptions, reducing change orders and schedule delays.


MOBs Get Smarter and More Complex as Space Pressures Mount

Healthcare facilities teams are turning to data-driven space strategies while adapting to increasingly sophisticated building demands.


Ascension Saint Thomas Sets Date for Groundbreaking on New Hospital and Health Campus

The groundbreaking ceremony will be held on June 16.


Women in Construction Sees Growth on Florida Jobsite

More than 60 women are part of the workforce building a new Orlando Health Hospital.


Managing Soft Surfaces, Clean or Soiled

Soft surfaces present a cross-contamination risk, even if they’re arriving from the laundry. Here are some best practices to handle both soiled and clean linens.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.