Kentec Protects Top Cambridge Biolab Facilit


The more integrated research environment provided by the new buildings will bring the Institute’s computational biologists into closer proximity with the established programmes developing bioscience therapies and technologies to treat human disease.

The open protocol system, supplied and installed by Leader Systems, was designed around a six-loop Kentec Syncro AS analogue addressable fire control panel incorporating approximately 400 addressable devices and 250 loop driven sounders, to provide a complete building system solution with flexible cause and effect capabilities. 

Kentec’s flagship ‘open protocol’ Syncro series, recognized as one of the most powerful systems of its type on the market today, guarantees the very highest standards of performance, safety and reliability that such a leading edge research facility demands.
 
For more information, visit www.kentec.co.uk



September 19, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.