Kentec Protects Top Cambridge Biolab Facility


A new life safety system based around Kentec’s Syncro fire alarm control panel technology has been installed at a new biology laboratory facility – part of the Babraham Research Campus Cambridge, considered to be the UK’s leading campus that supports early-stage bioscience enterprise.

The more integrated research environment provided by the new buildings will bring the Institute’s computational biologists into closer proximity with the established programmes developing bioscience therapies and technologies to treat human disease.

The open protocol system, supplied and installed by Leader Systems, was designed around a six-loop Kentec Syncro AS analogue addressable fire control panel incorporating approximately 400 addressable devices and 250 loop driven sounders, to provide a complete building system solution with flexible cause and effect capabilities. 

Kentec’s flagship ‘open protocol’ Syncro series, recognised as one of the most powerful systems of its type on the market today, guarantees the very highest standards of performance, safety and reliability that such a leading edge research facility demands.
 
For product information Kentec, visit www.kentec.co.uk.

October 10, 2016


Topic Area: Press Release


Recent Posts

Reframing the Construction Manager as a Community Manager

Managers must work with patients, community residents and other interested parties to ensure a smooth, successful construction projects


Health First Celebrates 'Topping Off' Ceremony for New Cape Canaveral Hospital Campus

Construction is slated to finish by the end of 2026 or early 2027.


The University of Hawai'i Cancer Center Caught Up in Cyberattack

Investigations are still ongoing to assess other sensitive information that may have been impacted.


Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.