Larson Electronics LLC Releases 225 Amp 480V 3 Phase Portable Power Distribution Panel


Larson Electronics LLC, a leading industrial lighting company, announced the release of a 225- amp portable power distribution panel that provides reliable and safe power distribution ideal for use in industrial worksites. This power distribution panel allows operators to tap into and distribute 480VAC power from a variety of sources including remote generators and standard grid power.

The PDU-PNL-3P-MCB-225A-480V-N3R-2X100A.3P is a 250-amp portable power distribution panel that offers operators in industrial worksites a safe way to utilize power sources independently of the work area. This portable panel operates on 480V AC three phase voltage, running the power through a 225-amp main circuit breaker panel. This panel contains two, 100-amp 3-pole 480V branch breakers.

This NEMA 3R distribution panel is operable indoors and outdoors for general applications such as construction sites, plants maintenance and turnaround, exhibits and shipyard operations. The PDU-PNL-3P-MCB-225A-480V-N3R-2X100A.3P is certified to UL 1640 and housed in a space saving enclosure that protects the unit from particles in the air and moisture. The unit is constructed of steel and features a slim profile with plug-in mounting configurations. Lockable opening deters the possibility of tampering. Knockouts are included for the convenient installation of operator provided cables.

"This power distribution panel is perfect for general use power distribution both indoors and outdoors,” said Rob Bresnahan, CEO of Larson Electronics LLC. “Larson Electronics is certified to build portable power distribution systems, ensuring this distribution panel is built in accordance to NFPA 70 and UL 1640 certifications.”

Larson Electronics LLC



September 13, 2018


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.