Larson Electronics Releases Explosion Proof Emergency System, 90Min Runtime, 120/277V, W/ Exit Sign


Larson Electronics announced the release of an explosion proof emergency system with exit sign for operational safety in hazardous work settings. This unit is compatible with 120-277V AC 60Hz and is ATEX/IECEx rated. This emergency system offers 90 minutes of emergency backup during power failure events.

The EXP-EMG-EXT-LE8-3L explosion proof emergency system with exit sign is rated for use in Class I, Divisions 1 and 2; and Class II, Divisions 1 and 2 hazardous locations. This unit for flammable work areas features a one-sided explosion proof LED exit sign and two 12-watt LEDs with a sealed lead acid battery pack for emergency operation during power failure events. An explosion proof enclosure holds the electrical components at the center of the system.

Larson Electronics’ explosion proof emergency system features two LEDs that produces a total of 2,640 lumens of light and produces a 40˚ spot beam measuring 300 feet long by 225 feet wide. An adjustable pendant mount mechanism allows operators to control the beam direction. This unit is rated NEMA Type 3, 4, 4X, 7 (B, C, D), and 9 (E, F, G) and can operate in temperatures between -40˚C and 60˚C. This unit is waterproof up to three meters and features housing made of extruded aluminum with polycarbonate lenses. Suitable applications include hazardous locations, industrial facilities, and more.



July 29, 2019


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.