Larson Electronics Releases Explosion Proof Emergency System, 90Min Runtime, 120/277V, W/ Exit Sign


Larson Electronics announced the release of an explosion proof emergency system with exit sign for operational safety in hazardous work settings. This unit is compatible with 120-277V AC 60Hz and is ATEX/IECEx rated. This emergency system offers 90 minutes of emergency backup during power failure events.

The EXP-EMG-EXT-LE8-3L explosion proof emergency system with exit sign is rated for use in Class I, Divisions 1 and 2; and Class II, Divisions 1 and 2 hazardous locations. This unit for flammable work areas features a one-sided explosion proof LED exit sign and two 12-watt LEDs with a sealed lead acid battery pack for emergency operation during power failure events. An explosion proof enclosure holds the electrical components at the center of the system.

Larson Electronics’ explosion proof emergency system features two LEDs that produces a total of 2,640 lumens of light and produces a 40˚ spot beam measuring 300 feet long by 225 feet wide. An adjustable pendant mount mechanism allows operators to control the beam direction. This unit is rated NEMA Type 3, 4, 4X, 7 (B, C, D), and 9 (E, F, G) and can operate in temperatures between -40˚C and 60˚C. This unit is waterproof up to three meters and features housing made of extruded aluminum with polycarbonate lenses. Suitable applications include hazardous locations, industrial facilities, and more.



July 29, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.