Larson Electronics Releases Power Distribution Panel, 800A, 480V 3PH, (2) 400A 3P 480V Breakers


Larson Electronics, a Texas-based company with over 40 years of experience spearheading the industrial lighting and equipment sectors, announced the release of a power distribution panel providing 480V three-phase via a main lug only panel. The main lug only panel features two 400-amp 2-pole 480V branch breakers. This 800-amp unit allows operators the ability to safely tap into and distribute 480V AC power from generators and direct grid power.

The PDU-PNL-3P-MLO-800A-480V-2X400A.3P power distribution panel comes equipped with knockouts for installation via operator-provided line-in cables. This panel is designed to operate with 480V three-phase voltage where power distribution runs 480V through an 800-amp main lug only panel. This unit is housed in a NEMA 3R steel enclosure that protects against dust, dirt and moisture for indoor and outdoor use. This unit can be locked to deter tampering.

Larson Electronics’ power distribution panel’s transformer is grounded to the frame with a grounding lug that is provided. This unit measures 27” in length by 15” wide by 7” in height and weighs 39 pounds. This unit is suitable for use indoors and outdoors, construction sites, plant maintenance and turnarounds, and other hazardous locations.



May 21, 2019


Topic Area: Press Release


Recent Posts

What Every EVS Leader Needs To Know

Managers must demonstrate mastery of infection prevention standards, accountability through measurable outcomes and visible collaboration with clinical teams.


Blackbird Health Opens New Clinic in New Jersey

The new clinic is located in Mount Laurel.


St. John's Riverside Hospital Falls Victim to Data Breach

There is no indication that personal information has been misused for the purposes of identity theft or fraud.


Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.