Life Safety Q&A: Four-inch corridor projection

Brad Keyes continues the discussion on regulations for med-room corridor doors

By Brad Keyes / Special to Healthcare Facilities Today


Q: With the adoption of the new 2012 Life Safety Code by CMS, we had a discussion about projections from the corridor wall. Since the LSC only allows projections to be 4 inches, the question that came up was in regards to fire extinguishers mounted to the wall and not recessed as they project out from the wall about 7 inches. Will we be required to recess them or will they be allowed? The same question was raised about wall mounted telephones?

A: Actually, the 2012 LSC allows a 6-inch projection into the corridor [see 19.2.3.4(4)], but CMS’ Final Rule published April 4, 2016 said they will enforce the more restrictive 4-inch maximum projection into the corridor, based on the Americans with Disabilities Act (ADA). For all healthcare facilities that receive Medicare & Medicaid funds, they must comply with CMS’ exception to the 2012 LSC.  

To answer your question, there are no exceptions to the 4-inch maximum projection rule. So, anything projecting more than 4 inches into the corridor, including fire extinguishers and telephones, would likely be cited by a surveyor or inspector. 

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



August 2, 2017


Topic Area: Regulations, Codes & Standards


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Intermountain Healthcare Receives $50M Gift for Standalone Children's Hospital

To honor the family's gift, Intermountain Health will name the inpatient tower the Larry & Heidi Canarelli Inpatient Tower.


Arrowhead Regional Medical Center Reports Data Breach via Third Party

There is currently no evidence that the information has been viewed by any third-party or of any misuse of the impacted information as a result of this incident.


Safety Synergy: Infection Prevention That Protects Patients and Workers

For environmental services managers, the central message is that cleaning and disinfection should be governed through an integrated systems approach.


Prefabricated Wall Panels Speed UCF Lake Nona Medical Center Construction

StoPanel systems helped the project meet Florida’s wind-load and impact requirements while supporting a fast, safe exterior installation.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.