Lista announces Stak System storage and handling system


Lista International Corporation announces the availability of the STAK System® pallet-based storage and handling system. Based on a system of dynamically adjustable pallets (rather than fixed shelves) and a captive lifting and handling device, the STAK System helps maximize storage density by minimizing the vertical space requirements of each stored pallet and its contents.

Ergonomically designed, the STAK system is loaded with features to save space and maximize productivity. It is fully modular, with add on bays that allow the system to grow as your capacity needs do. Its unique handling device is completely ergonomic,which makes removing even large loads easy. Loaded pallets are removed and replaced by simply guiding the mast to a new position, where the pallets can then be easily extracted. The handling device also maneuvers on four axes, creating total 360° flexibility and allowing for simple, intuitive positioning. In addition, the STAK system uses easy-to-learn controls that do not require a license or certification to operate.

Since each work environment has different requirements, Lista also offers a range of specialized STAK Systems to suit any job. These include the 2K, designed to accommodate storage items up to 2,000 lbs. in weight, and the 4K, designed to accommodate storage items up to 4,000 lbs. in weight. For the storage, staging, and retrieval of 55-gallon hazardous material drums, Lista also offers the HazMat STAK System®.

The system can be further customized with a variety of pallet styles and sizes, such as tire, barrel, or reel storage pallets, as well as options like Cantilever overhang, safety mesh, or a motorized bridge.

To find out more, call or write to: Lista International Corporation, 106 Lowland Street, Holliston, MA 01746 USA; TEL 1-800-722-3020; FAX 508-626-0353; email info@listaintl.com or visit Lista’s web site at http://www.listaintl.com/cabinets-storage.



April 21, 2014


Topic Area: Press Release


Recent Posts

Respecting EVS Workers: 19 Minutes Is Not Enough

The infection control problem is time, and it's up to facility managers, EVS directors and infection preventionists to address the problem.


Where are the Greenhouse Gas Emissions Hotspots in Healthcare?

First-year findings from Boston Medical Center show medical waste generates a disproportionate amount of healthcare emissions.


Caravel Autism Health Opens Clinic in Lake Zurich, Illinois

The clinic features colorful, sensory-friendly spaces where children work one-on-one with therapists.


The Future of Healthcare Facility Construction Projects

Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.


Ground Broken on Jupiter Medical Center's Second Hospital

The 53,000-square-foot hospital will include 29 inpatient beds, four operating rooms, 24-hour emergency services, a diagnostic laboratory and imaging services.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.