Marley MD Everestä Counterflow Cooling Tower’s Modular Design Speeds Site Delivery and Installation


SPX Cooling Technologies, Inc., a full-line, full-service industry leader in the design and manufacture of evaporative and air-cooled heat exchangers, announces the new Marley MD Everest, a modular counterflow cooling tower. The Marley MD Everest Cooling Tower is designed to meet today’s process cooling demands, and is suitable for power generation plants, chemical, oil and gas plants, and other process applications with a wide range of thermal loads.

Whether designing a new plant or replacing an aging traditional site-constructed cooling tower, the MD Everest tower’s pre-configured design offers significant advantages that enable safer assembly processes, including up to 60 percent faster delivery and 80 percent faster installation compared to field-erected cooling towers.

The MD Everest counterflow tower’s robust structure meets seismic and wind load requirements per ASCE and IBC building codes, and withstands the rigors of process cooling applications using heavy-duty, corrosion-resistant materials. Industrial-strength Marley mechanical components include a five-year maintenance-free System 5 Marley Geareducer® gear drive; energy-efficient, low-clog PVC heat exchange fill media; and Motor Outside Airstream (MOA), standard. The MD Everest also includes a five-year mechanical component warranty.

MD Everest cooling tower arrives at the site in modules that are built and assembled in a controlled factory environment, which facilitate high quality and efficient installation. Its thermal performance is pending certification by the Cooling Technology Institute (CTI), eliminating the need and expense for on-site testing. 

For more information, please visit www.spxcooling.com.



February 8, 2018


Topic Area: Press Release


Recent Posts

Streamlined Integrated Project Delivery Tackles Design Challenges

Successful implementation of IPD Light can improve patient care, project outcomes and bottom lines.


Encompass Health Rehabilitation Hospital of Central Florida - Sumter County Opens

It is a satellite location of Encompass Health Rehabilitation Hospital of Central Florida.


Rudolph and Sletten Awarded $960M for New UCSF Benioff Children's Hospital

Construction work is expected to commence in September 2025 with substantial completion anticipated in 2031.


How Designers Create Welcoming Senior Care Communities

Risk assessments and cost analysis play a role in creating thriving communities.


Data-Driven Decisions: How Analytics Are Shaping Healthcare Facility Planning

Hospitals can use data to prioritize upgrades, extend building lifespans and maximize the impact of limited capital budgets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.