Massive Construction Project Opens in New York

The cost of the project originally had been estimated at $545 million


The COVID-19 pandemic has limited and postponed a host of procedures and processes in healthcare facilities, and delayed and cancelled construction and upgrade projects, as well. For one community, however, progress has continued in a major way.

What is billed as the largest construction project in Poughkeepsie, N.Y.’s history, the new patient pavilion at Vassar Brothers Medical Center, moves from construction to completion when the emergency department and trauma center open Jan. 9, according to the Westfair and Fairfield County Business Journals.

The cost of the project originally had been estimated at $545 million. The eight-story, 752,000-square-foot building has 294 patient rooms with 30 in the intensive care unit. The emergency department and trauma center has 66 treatment rooms and parking for ambulances and the public. There are 13 surgical suites in the building, which also has a conference center that can hold up to 300 people, a 220-seat cafeteria with outdoor dining and a rooftop helicopter landing pad.

The building was designed to be compatible with the topography of the Hudson River area and includes design elements such as an S-curve along with stone and mosaic finishes. The individual patient rooms are double the size of the existing 365-bed hospital’s semi-private rooms. The pavilion incorporates energy efficient features and sustainable design such as a green roof and is expected to receive LEED certification for energy efficiency.

 

Click here to read the article.



January 8, 2021


Topic Area: Construction


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.