MaxLite introduces three-way LED lamp as 40W/60W/100W incandescent replacement


MaxLite continues to expand its award-winning portfolio of ENEGY STAR certified LED lamps with the 3-Way Omnidirectional A-Lamp.

A direct replacement for 40-, 60- and 100-watt incandescent bulbs, the MaxLite 3-way Lamp emits three distinct levels of light while consuming as few as five watts. With the simple click of a switch, consumers can choose from 450, 800 or 1600 lumens to create the perfect illumination for any task or mood. Offered in color temperatures of 2700K and 3000K, the 3-Way Lamp replicates the soft white light of an incandescent bulb at 85 percent energy savings.

 “The MaxLite 3-way LED Lamp is another example of our commitment to providing flexible and affordable alternatives to incandescent lighting that make the adoption of LED an easy choice for consumers,” said Product Manager Alex Truong.

The LED 3-way Lamp lasts 25,000 hours and comes backed by MaxLite’s five-year limited warranty and lifetime product support. 

For complete specifications, view the product page at: http://www.maxlite.com/products/led-omnidirectional-a21-3-way-series

To download a high-resolution product image, click here: http://www.maxlite.com/PDFS/PR/PRkit/MaxLite_3WayA21.zip

 



May 27, 2016


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.